IAC logo
IAC Assessment: IA0035
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0035
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1992
Principal Product AUTO AND INDUSTRIAL HOSES
NAICS n/a
SIC 3052 - Rubber & Plastics Hose & Belting
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 0
Annual Production 146,000 Thousand Feet
Production Hrs. Annual 8,320
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $268,528 5,760,258 kWh $0.05
Natural Gas $73,396 21,469 MMBtu $3.42
TOTAL ENERGY COSTS $341,924
RECOMMENDED SAVINGS* $10,904 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,976
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,075
Cost:
$743
$3,387 72,685 - - $(-312) - $3,387
72,685
kWh
-
-
MMBtu
$(-312)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,061
Cost:
$1,705
$4,061 87,046 - - - - $4,061
87,046
kWh
-
-
MMBtu
-
-
$
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$1,990
Cost:
$2,313
$1,990 42,790 - - - - $1,990
42,790
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$127
Cost:
$200
$127 2,638 - - - - $127
2,638
kWh
-
-
MMBtu
-
-
$
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$928
Cost:
$710
- - $928 271 - - -
-
kWh
$928
271
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$723
Cost:
$600
- - $723 181 - - -
-
kWh
$723
181
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$10,904
Cost:
$6,271
$9,565 205,159 $1,651 452 $(-312) - $9,565
205,159
kWh
$1,651
452
MMBtu
$(-312)
-
$
TOTAL IMPLEMENTED Savings:
$9,976
Cost:
$5,561
$9,565 205,159 $723 181 $(-312) - $9,565
205,159
kWh
$723
181
MMBtu
$(-312)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes