IAC logo
IAC Assessment: IA0039
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0039
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1992
Principal Product SCHOOL BUSES
NAICS n/a
SIC 3713 - Truck And Bus Bodies
Sales $50,000,000-$100,000,000
# of Employees 240
Plant Area (Sq.Ft.) 0
Annual Production 4,000 Pieces
Production Hrs. Annual 1,920
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,760 1,636,284 kWh $0.08
Natural Gas $70,161 17,421 MMBtu $4.03
TOTAL ENERGY COSTS $201,921
RECOMMENDED SAVINGS* $9,452 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$6,617
Cost:
$15,000
$(-1,115) (-13,775) $7,732 1,923 - - $(-1,115)
(-13,775)
kWh
$7,732
1,923
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$744
Cost:
$600
- - $744 185 - - -
-
kWh
$744
185
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,769
Cost:
$360
$1,769 21,981 - - - - $1,769
21,981
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$322
Cost:
$73
$520 6,448 - - $(-198) - $520
6,448
kWh
-
-
MMBtu
$(-198)
-
$
TOTAL RECOMMENDED Savings:
$9,452
Cost:
$16,033
$1,174 14,654 $8,476 2,108 $(-198) - $1,174
14,654
kWh
$8,476
2,108
MMBtu
$(-198)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes