IAC logo
IAC Assessment: IA0040
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0040
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1992
Principal Product CANNED VEGETABLES
NAICS n/a
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 0
Annual Production 3,500,000 Pieces
Production Hrs. Annual 5,040
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,121 3,557,737 kWh $0.04
Natural Gas $180,098 72,949 MMBtu $2.47
TOTAL ENERGY COSTS $321,219
RECOMMENDED SAVINGS* $43,333 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,248
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$25,896
Cost:
$1,200
- - $25,896 10,484 - - -
-
kWh
$25,896
10,484
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,369
Cost:
$18,000
- - $6,369 2,578 - - -
-
kWh
$6,369
2,578
MMBtu
-
-
$
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$5,208
Cost:
$650
- - $5,208 2,108 - - -
-
kWh
$5,208
2,108
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,722
Cost:
$4,219
- - $1,722 697 - - -
-
kWh
$1,722
697
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,718
Cost:
$2,220
$2,788 70,340 - - $(-70) - $2,788
70,340
kWh
-
-
MMBtu
$(-70)
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$890
Cost:
$1,701
$890 22,567 - - - - $890
22,567
kWh
-
-
MMBtu
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$530
Cost:
$50
$530 13,482 - - - - $530
13,482
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$43,333
Cost:
$28,040
$4,208 106,389 $39,195 15,867 $(-70) - $4,208
106,389
kWh
$39,195
15,867
MMBtu
$(-70)
-
$
TOTAL IMPLEMENTED Savings:
$3,248
Cost:
$2,270
$3,318 83,822 - - $(-70) - $3,318
83,822
kWh
-
-
MMBtu
$(-70)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes