IAC logo
IAC Assessment: IA0075
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0075
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1994
Principal Product grain drying equipment
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 206,000
Annual Production 16,000 Pieces
Production Hrs. Annual 2,170
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,138 1,369,871 kWh $0.05
Natural Gas $26,030 5,872 MMBtu $4.43
TOTAL ENERGY COSTS $90,168
RECOMMENDED SAVINGS* $8,382 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,269
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,332
Cost:
$1,285
$3,332 71,219 - - $3,332
71,219
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$554
Cost:
$1,013
$554 11,723 - - $554
11,723
kWh
-
-
MMBtu
03: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$1,738
Cost:
$995
$75 1,758 $1,663 375 $75
1,758
kWh
$1,663
375
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,369
Cost:
$1,000
$1,369 29,308 - - $1,369
29,308
kWh
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$645
Cost:
$573
- - $645 146 -
-
kWh
$645
146
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$744
Cost:
$3,210
$744 - - - $744
-
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,382
Cost:
$8,076
$6,074 114,008 $2,308 521 $6,074
114,008
kWh
$2,308
521
MMBtu
TOTAL IMPLEMENTED Savings:
$6,269
Cost:
$3,866
$3,961 84,700 $2,308 521 $3,961
84,700
kWh
$2,308
521
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas