IAC logo
IAC Assessment: IA0080
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0080
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1994
Principal Product industrial and impact doors
NAICS n/a
SIC 2399 - Fabricated Textile Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 200,000
Annual Production 7,000,000 Pounds
Production Hrs. Annual 2,470
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,557 1,567,995 kWh $0.06
Natural Gas $30,643 6,293 MMBtu $4.87
Fuel Oil #1 $2,514 369 MMBtu $6.81
TOTAL ENERGY COSTS $120,714
RECOMMENDED SAVINGS* $9,034 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,996
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,038
Cost:
$799
$3,038 54,513 - - - - $3,038
54,513
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$203
Cost:
$600
$203 3,517 - - - - $203
3,517
kWh
-
-
MMBtu
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,301
Cost:
$250
- - - - $2,301 - -
-
kWh
-
-
MMBtu
$2,301
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,279
Cost:
$100
- - $2,279 468 - - -
-
kWh
$2,279
468
MMBtu
-
-
$
05: 2.7314 REDUCE VENTILATION AIR Savings:
$1,021
Cost:
$160
$186 3,224 $835 172 - - $186
3,224
kWh
$835
172
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$192
Cost:
$35
$192 3,517 - - - - $192
3,517
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$9,034
Cost:
$1,944
$3,619 64,771 $3,114 640 $2,301 - $3,619
64,771
kWh
$3,114
640
MMBtu
$2,301
-
$
TOTAL IMPLEMENTED Savings:
$5,996
Cost:
$1,145
$581 10,258 $3,114 640 $2,301 - $581
10,258
kWh
$3,114
640
MMBtu
$2,301
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes