IAC logo
IAC Assessment: IA0084
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0084
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1994
Principal Product plastic pipe
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 130,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $344,148 7,972,450 kWh $0.04
Natural Gas $5,894 1,262 MMBtu $4.67
TOTAL ENERGY COSTS $350,042
RECOMMENDED SAVINGS* $20,198 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,189
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$431
Cost:
$390
$171 4,103 $260 56 $171
4,103
kWh
$260
56
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,631
Cost:
$22,020
$6,631 - - - $6,631
-
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,786
Cost:
$545
$5,786 133,939 - - $5,786
133,939
kWh
-
-
MMBtu
04: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$5,074
Cost:
$800
$5,074 117,526 - - $5,074
117,526
kWh
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,758
Cost:
$250
$1,758 40,739 - - $1,758
40,739
kWh
-
-
MMBtu
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$325
Cost:
$150
$325 7,620 - - $325
7,620
kWh
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$193
Cost:
$516
$193 4,396 - - $193
4,396
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$20,198
Cost:
$24,671
$19,938 308,323 $260 56 $19,938
308,323
kWh
$260
56
MMBtu
TOTAL IMPLEMENTED Savings:
$2,189
Cost:
$640
$1,929 44,842 $260 56 $1,929
44,842
kWh
$260
56
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas