Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1994
Principal Product mufflers
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 320
Plant Area (Sq.Ft.) 225,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 5,550
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,060 4,147,128 kWh $0.04
Natural Gas $116,702 29,173 MMBtu $4.00
TOTAL ENERGY COSTS $274,762
RECOMMENDED SAVINGS* $26,248 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,210
#|Description Savings
Cost
Status Electricity Usage Water Consumption Electricity Usage Water Consumption
$ kWh $ Tgal
01: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$19,839
Cost:
$32,340
$(-10,223) (-268,171) $30,062 - $(-10,223)
(-268,171)
kWh
$30,062
-
Tgal
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,944
Cost:
$400
$1,944 50,996 - - $1,944
50,996
kWh
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,089
Cost:
$800
$1,089 28,722 - - $1,089
28,722
kWh
-
-
Tgal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,958
Cost:
$1,905
$1,958 51,290 - - $1,958
51,290
kWh
-
-
Tgal
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$652
Cost:
$1,050
$652 16,999 - - $652
16,999
kWh
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$547
Cost:
$5,083
$547 14,361 - - $547
14,361
kWh
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$219
Cost:
$56
$219 5,862 - - $219
5,862
kWh
-
-
Tgal
TOTAL RECOMMENDED Savings:
$26,248
Cost:
$41,634
$(-3,814) (-99,941) $30,062 - $(-3,814)
(-99,941)
kWh
$30,062
-
Tgal
TOTAL IMPLEMENTED Savings:
$5,210
Cost:
$3,161
$5,210 136,870 - - $5,210
136,870
kWh
-
-
Tgal
Savings
Cost
$ kWh $ Tgal
Electricity Usage Water Consumption Electricity Usage Water Consumption