IAC logo
IAC Assessment: IA0093
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0093
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1994
Principal Product doors and windows
NAICS n/a
SIC 2431 - Millwork
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 475,000
Annual Production 299,000 Pieces
Production Hrs. Annual 5,330
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $279,857 6,096,718 kWh $0.05
Natural Gas $33,584 9,434 MMBtu $3.56
TOTAL ENERGY COSTS $313,441
RECOMMENDED SAVINGS* $48,248 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,591
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,269
Cost:
$9,543
$12,269 269,637 - - $12,269
269,637
kWh
-
-
MMBtu
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,868
Cost:
$443
$1,868 41,032 - - $1,868
41,032
kWh
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$476
Cost:
$1,267
$476 10,551 - - $476
10,551
kWh
-
-
MMBtu
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$10,114
Cost:
$28,000
- - $10,114 2,697 -
-
kWh
$10,114
2,697
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,761
Cost:
$12,000
$7,761 170,574 - - $7,761
170,574
kWh
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,578
Cost:
$50
$6,578 144,490 - - $6,578
144,490
kWh
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,400
Cost:
$263
$4,400 96,424 - - $4,400
96,424
kWh
-
-
MMBtu
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,946
Cost:
$7,290
$2,946 - - - $2,946
-
kWh
-
-
MMBtu
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,515
Cost:
$2,539
$1,515 33,118 - - $1,515
33,118
kWh
-
-
MMBtu
10: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$321
Cost:
$130
$321 11,723 - - $321
11,723
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$48,248
Cost:
$61,525
$38,134 777,549 $10,114 2,697 $38,134
777,549
kWh
$10,114
2,697
MMBtu
TOTAL IMPLEMENTED Savings:
$25,591
Cost:
$11,566
$25,591 562,134 - - $25,591
562,134
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas