IAC Assessment: IA0132
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0132
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1995
Principal Product Hydraulic cylinders
NAICS n/a
SIC 3593 - Fluid Power Cylinders & Actuators
Sales $1,000,000-$5,000,000
# of Employees 90
Plant Area (Sq.Ft.) 79,000,000
Annual Production 4,500 Pieces
Production Hrs. Annual 6,120
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,214 1,092,614 kWh $0.06
Natural Gas $21,504 5,778 MMBtu $3.72
TOTAL ENERGY COSTS $133,978
RECOMMENDED SAVINGS* $65,213 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,777
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)
$ kWh $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,991
Cost:
$245
$10,991 181,419 - - $10,991
181,419
kWh
-
-
lb
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,009
Cost:
$50
$3,009 49,531 - - $3,009
49,531
kWh
-
-
lb
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,448
Cost:
$93
$1,448 24,033 - - $1,448
24,033
kWh
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,481
Cost:
$4,837
$1,481 24,326 - - $1,481
24,326
kWh
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$380
Cost:
$136
$380 6,155 - - $380
6,155
kWh
-
-
lb
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$124
Cost:
$231
$124 2,052 - - $124
2,052
kWh
-
-
lb
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$936
Cost:
-
$936 - - - $936
-
kWh
-
-
lb
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,841
Cost:
$12,000
$2,841 46,600 - - $2,841
46,600
kWh
-
-
lb
09: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$35,460
Cost:
$500
- - $35,460 18,000 -
-
kWh
$35,460
18,000
lb
10: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$5,805
Cost:
$16,900
- - $5,805 14,400 -
-
kWh
$5,805
14,400
lb
11: 3.7115 CLEAN LINES WITH "PIGS" INSTEAD OF SOLVENTS / SOLUTIONS Savings:
$2,738
Cost:
$1,300
- - $2,738 30,420 -
-
kWh
$2,738
30,420
lb
TOTAL RECOMMENDED Savings:
$65,213
Cost:
$36,292
$21,210 334,116 $44,003 62,820 $21,210
334,116
kWh
$44,003
62,820
lb
TOTAL IMPLEMENTED Savings:
$17,777
Cost:
$12,295
$17,777 277,550 - - $17,777
277,550
kWh
-
-
lb
Savings
Cost
$ kWh $ lb
Electricity Usage Solid Waste (non-haz) Electricity Usage Solid Waste (non-haz)