Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1996 |
Principal Product | bumpers |
NAICS | n/a |
SIC | 3465 - Automotive Stampings |
Sales | $50,000,000-$100,000,000 |
# of Employees | 240 |
Plant Area (Sq.Ft.) | 170,000 |
Annual Production | 8,512,466 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $127,085 | 5,514,361 | kWh | $0.02 |
Electricity Demand | $111,874 | 11,868 | kW-months/year | $9.43 |
Electricity Fees | $4,090 | - | $ | - |
Natural Gas | $129,546 | 49,407 | MMBtu | $2.62 |
TOTAL ENERGY COSTS | $451,368 | |||
RECOMMENDED SAVINGS* | $83,584 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,562 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $21,986 Cost: $8,775 |
$16,200 | 539,859 | $12,222 | 1,800 | $(-6,436) | (-2,457) | - | - | - | - | - | - |
$16,200 539,859 kWh |
$12,222 1,800 kW-months/year |
$(-6,436) (-2,457) MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $7,411 Cost: $4,200 |
- | - | - | - | - | - | - | - | - | - | $7,411 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
$7,411 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,992 Cost: $506 |
$6,189 | 206,331 | $2,803 | 413 | - | - | - | - | - | - | - | - |
$6,189 206,331 kWh |
$2,803 413 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,499 Cost: $50 |
$1,035 | 34,584 | $464 | 68 | - | - | - | - | - | - | - | - |
$1,035 34,584 kWh |
$464 68 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $3,216 Cost: - |
$2,214 | 73,857 | $1,002 | 148 | - | - | - | - | - | - | - | - |
$2,214 73,857 kWh |
$1,002 148 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,383 Cost: $1,792 |
$949 | 31,653 | $434 | 64 | - | - | - | - | - | - | - | - |
$949 31,653 kWh |
$434 64 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,798 Cost: $3,215 |
$1,236 | 41,325 | $562 | 83 | - | - | - | - | - | - | - | - |
$1,236 41,325 kWh |
$562 83 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,049 Cost: $1,597 |
$585 | 19,637 | $464 | 68 | - | - | - | - | - | - | - | - |
$585 19,637 kWh |
$464 68 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $159 Cost: $338 |
$118 | 3,810 | $41 | 6 | - | - | - | - | - | - | - | - |
$118 3,810 kWh |
$41 6 kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $643 Cost: - |
$643 | 21,395 | - | - | - | - | - | - | - | - | - | - |
$643 21,395 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $30,120 Cost: $3,800 |
- | - | - | - | - | - | $30,120 | 22,800 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$30,120 22,800 gal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT |
Savings: $5,328 Cost: $1,370 |
- | - | - | - | - | - | - | - | $5,328 | 720 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$5,328 720 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $83,584 Cost: $25,643 |
$29,169 | 972,451 | $17,992 | 2,650 | $(-6,436) | (-2,457) | $30,120 | 22,800 | $5,328 | 720 | $7,411 | - | $29,169 972,451 kWh |
$17,992 2,650 kW-months/year |
$(-6,436) (-2,457) MMBtu |
$30,120 22,800 gal |
$5,328 720 lb |
$7,411 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,562 Cost: $3,668 |
$9,995 | 333,236 | $4,239 | 625 | - | - | - | - | $5,328 | 720 | - | - | $9,995 333,236 kWh |
$4,239 625 kW-months/year |
- - MMBtu |
- - gal |
$5,328 720 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Solid Waste (non-haz) | Administrative Changes |