IAC logo
IAC Assessment: IA0136
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0136
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1996
Principal Product washers and dryers - iron castings
NAICS n/a
SIC 3550 -
Sales $10,000,000-$50,000,000
# of Employees 380
Plant Area (Sq.Ft.) 157,000
Annual Production 3,000,000 Pounds
Production Hrs. Annual 4,080
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $411,940 18,090,856 kWh $0.02
Electricity Demand $249,363 20,184 kW-months/year $12.35
Electricity Fees $27,781 - $ -
Natural Gas $316,071 89,189 MMBtu $3.54
TOTAL ENERGY COSTS $1,069,565
RECOMMENDED SAVINGS* $17,412 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,752
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ Tgal $ lb
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,549
Cost:
$75
$3,594 159,144 $2,955 468 - - - - $3,594
159,144
kWh
$2,955
468
kW-months/year
-
-
Tgal
-
-
lb
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,485
Cost:
$25
$591 26,084 $894 142 - - - - $591
26,084
kWh
$894
142
kW-months/year
-
-
Tgal
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,926
Cost:
$262
$1,168 50,703 $1,758 276 - - - - $1,168
50,703
kWh
$1,758
276
kW-months/year
-
-
Tgal
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,221
Cost:
$226
$256 11,137 $4,965 786 - - - - $256
11,137
kWh
$4,965
786
kW-months/year
-
-
Tgal
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$226
Cost:
$508
$90 3,810 $136 22 - - - - $90
3,810
kWh
$136
22
kW-months/year
-
-
Tgal
-
-
lb
06: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$664
Cost:
$1,500
- - - - - - $664 3,360 -
-
kWh
-
-
kW-months/year
-
-
Tgal
$664
3,360
lb
07: 3.4151 MINIMIZE WATER USAGE Savings:
$341
Cost:
$420
- - - - $341 26,220 - - -
-
kWh
-
-
kW-months/year
$341
26,220
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$17,412
Cost:
$3,016
$5,699 250,878 $10,708 1,694 $341 26,220 $664 3,360 $5,699
250,878
kWh
$10,708
1,694
kW-months/year
$341
26,220
Tgal
$664
3,360
lb
TOTAL IMPLEMENTED Savings:
$4,752
Cost:
$707
$1,759 76,787 $2,652 418 $341 26,220 - - $1,759
76,787
kWh
$2,652
418
kW-months/year
$341
26,220
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz)