IAC logo
IAC Assessment: IA0137
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0137
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1996
Principal Product tile
NAICS n/a
SIC 3253 - Ceramic Wall And Floor Tile
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 200,000
Annual Production 22,000 Thousand Feet
Production Hrs. Annual 8,760
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $209,100 9,839,977 kWh $0.02
Electricity Demand $186,118 19,200 kW-months/year $9.69
Electricity Fees $454 - $ -
Natural Gas $437,939 249,390 MMBtu $1.76
TOTAL ENERGY COSTS $833,611
RECOMMENDED SAVINGS* $34,072 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,888
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,184
Cost:
$11,600
- - - - $8,184 4,650 - - -
-
kWh
-
-
kW-months/year
$8,184
4,650
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,764
Cost:
$3,872
$2,429 115,768 $1,335 163 - - - - $2,429
115,768
kWh
$1,335
163
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,889
Cost:
$11,019
$3,033 144,490 $1,856 227 - - - - $3,033
144,490
kWh
$1,856
227
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,480
Cost:
$1,500
$1,126 53,634 $1,354 166 - - - - $1,126
53,634
kWh
$1,354
166
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,755
Cost:
$134
$1,420 67,702 $1,335 163 - - - - $1,420
67,702
kWh
$1,335
163
kW-months/year
-
-
MMBtu
-
-
lb
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$12,000
Cost:
$100
- - - - - - $12,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,000
-
lb
TOTAL RECOMMENDED Savings:
$34,072
Cost:
$28,225
$8,008 381,594 $5,880 719 $8,184 4,650 $12,000 - $8,008
381,594
kWh
$5,880
719
kW-months/year
$8,184
4,650
MMBtu
$12,000
-
lb
TOTAL IMPLEMENTED Savings:
$13,888
Cost:
$16,525
$8,008 381,594 $5,880 719 - - - - $8,008
381,594
kWh
$5,880
719
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost