IAC Assessment: IA0143
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0143
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1996
Principal Product Aluminum Castings
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $1,000,000-$5,000,000
# of Employees 45
Plant Area (Sq.Ft.) 22,500
Annual Production 1,913,487 Pounds
Production Hrs. Annual 6,000
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $20,586 820,340 kWh $0.03
Electricity Demand $15,282 2,736 kW-months/year $5.59
Electricity Fees $10,200 - $ -
Natural Gas $62,575 20,553 MMBtu $3.04
TOTAL ENERGY COSTS $123,314
RECOMMENDED SAVINGS* $37,809 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,962
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,183
Cost:
$640
$820 30,481 $363 61 - - - - - - $820
30,481
kWh
$363
61
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,401
Cost:
$1,128
- - - - $1,401 462 - - - - -
-
kWh
-
-
kW-months/year
$1,401
462
MMBtu
-
-
Tgal
-
-
lb
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,672
Cost:
$463
$1,182 43,669 $490 103 - - - - - - $1,182
43,669
kWh
$490
103
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$282
Cost:
$25
$197 7,327 $85 14 - - - - - - $197
7,327
kWh
$85
14
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$27,825
Cost:
$54,500
$2,894 108,148 $(-1,281) (-216) - - $26,212 113,033 - - $2,894
108,148
kWh
$(-1,281)
(-216)
kW-months/year
-
-
MMBtu
$26,212
113,033
Tgal
-
-
lb
06: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$5,446
Cost:
$16,125
- - - - - - - - $5,446 32,100 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$5,446
32,100
lb
TOTAL RECOMMENDED Savings:
$37,809
Cost:
$72,881
$5,093 189,625 $(-343) (-38) $1,401 462 $26,212 113,033 $5,446 32,100 $5,093
189,625
kWh
$(-343)
(-38)
kW-months/year
$1,401
462
MMBtu
$26,212
113,033
Tgal
$5,446
32,100
lb
TOTAL IMPLEMENTED Savings:
$30,962
Cost:
$55,628
$5,093 189,625 $(-343) (-38) - - $26,212 113,033 - - $5,093
189,625
kWh
$(-343)
(-38)
kW-months/year
-
-
MMBtu
$26,212
113,033
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (haz)