Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1996 |
Principal Product | aluminum castings |
NAICS | n/a |
SIC | 3363 - Aluminum Die-castings |
Sales | $5,000,000-$10,000,000 |
# of Employees | 62 |
Plant Area (Sq.Ft.) | 61,750 |
Annual Production | 3,000,000 Pounds |
Production Hrs. Annual | 5,760 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $94,453 | 2,386,284 | kWh | $0.04 |
Electricity Demand | $64,640 | 8,789 | kW-months/year | $7.35 |
Electricity Fees | $1,473 | - | $ | - |
Natural Gas | $122,486 | 31,621 | MMBtu | $3.87 |
TOTAL ENERGY COSTS | $324,685 | |||
RECOMMENDED SAVINGS* | $21,441 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,297 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $14,474 Cost: $5,900 |
- | - | - | - | $14,474 | - | - | - |
- - kWh |
- - kW-months/year |
$14,474 - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,132 Cost: $3,129 |
$1,853 | 46,014 | $1,279 | 180 | - | - | - | - |
$1,853 46,014 kWh |
$1,279 180 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,483 Cost: $49 |
$1,082 | 26,964 | $401 | 56 | - | - | - | - |
$1,082 26,964 kWh |
$401 56 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $280 Cost: $582 |
$205 | 4,982 | $75 | 11 | - | - | - | - |
$205 4,982 kWh |
$75 11 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $572 Cost: $1,160 |
$384 | 9,379 | $188 | 26 | - | - | - | - |
$384 9,379 kWh |
$188 26 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $469 Cost: $77 |
$341 | 8,499 | $128 | 18 | - | - | - | - |
$341 8,499 kWh |
$128 18 kW-months/year |
- - MMBtu |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $732 Cost: $125 |
- | - | - | - | - | - | $732 | 12,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$732 12,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.7211 MODIFY MATERIAL APPLICATION METHODS |
Savings: $299 Cost: $22 |
- | - | - | - | - | - | $299 | 480 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$299 480 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $21,441 Cost: $11,044 |
$3,865 | 95,838 | $2,071 | 291 | $14,474 | - | $1,031 | 12,480 | $3,865 95,838 kWh |
$2,071 291 kW-months/year |
$14,474 - MMBtu |
$1,031 12,480 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,297 Cost: $7,208 |
$1,807 | 44,842 | $717 | 100 | $14,474 | - | $299 | 480 | $1,807 44,842 kWh |
$717 100 kW-months/year |
$14,474 - MMBtu |
$299 480 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) |