Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1996 |
Principal Product | Edible Stocks and Broths |
NAICS | n/a |
SIC | 2099 - Food Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 64,000 |
Annual Production | 45,000,000 Pounds |
Production Hrs. Annual | 6,120 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $144,740 | 4,458,968 | kWh | $0.03 |
Electricity Demand | $32,297 | 10,272 | kW-months/year | $3.14 |
Electricity Fees | $785 | - | $ | - |
Natural Gas | $335,200 | 172,147 | MMBtu | $1.95 |
TOTAL ENERGY COSTS | $525,622 | |||
RECOMMENDED SAVINGS* | $11,369 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,964 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $6,888 Cost: $1,000 |
- | - | - | - | $6,888 | 3,532 | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,888 3,532 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $850 Cost: $165 |
- | - | - | - | $850 | 436 | - | - | - | - |
- - kWh |
- - kW-months/year |
$850 436 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $405 Cost: $1,186 |
$320 | 15,533 | $85 | 31 | - | - | - | - | - | - |
$320 15,533 kWh |
$85 31 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $350 Cost: $229 |
$271 | 13,189 | $79 | 29 | - | - | - | - | - | - |
$271 13,189 kWh |
$79 29 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $356 Cost: - |
- | - | - | - | - | - | - | - | $356 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$356 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $2,520 Cost: $2,500 |
- | - | - | - | - | - | $2,520 | 1,200,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,520 1,200,000 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $11,369 Cost: $5,080 |
$591 | 28,722 | $164 | 60 | $7,738 | 3,968 | $2,520 | 1,200,000 | $356 | - | $591 28,722 kWh |
$164 60 kW-months/year |
$7,738 3,968 MMBtu |
$2,520 1,200,000 Tgal |
$356 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,964 Cost: $3,894 |
$271 | 13,189 | $79 | 29 | $7,738 | 3,968 | $2,520 | 1,200,000 | $356 | - | $271 13,189 kWh |
$79 29 kW-months/year |
$7,738 3,968 MMBtu |
$2,520 1,200,000 Tgal |
$356 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Administrative Changes |