IAC Assessment: IA0151
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0151
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1996
Principal Product gray iron castings
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $10,000,000-$50,000,000
# of Employees 93
Plant Area (Sq.Ft.) 50,600
Annual Production 2,500 Tons
Production Hrs. Annual 4,500
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,311 1,436,401 kWh $0.04
Electricity Demand $24,169 6,732 kW-months/year $3.59
Natural Gas $44,996 9,337 MMBtu $4.82
TOTAL ENERGY COSTS $144,316
RECOMMENDED SAVINGS* $30,245 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,211
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$16,807
Cost:
$5,000
- - - - - - - - $16,807 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$16,807
-
$
02: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$9,571
Cost:
$25,000
- - - - $6,619 1,379 $432 1,200 $2,520 - -
-
kWh
-
-
kW-months/year
$6,619
1,379
MMBtu
$432
1,200
lb
$2,520
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,787
Cost:
$335
$2,201 51,290 $586 137 - - - - - - $2,201
51,290
kWh
$586
137
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$476
Cost:
-
$476 11,137 - - - - - - - - $476
11,137
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$377
Cost:
$1,434
$208 4,689 $169 40 - - - - - - $208
4,689
kWh
$169
40
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 3.5221 RECYCLE CASTING SAND Savings:
$227
Cost:
$26
- - - - - - $227 3,267 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$227
3,267
lb
-
-
$
TOTAL RECOMMENDED Savings:
$30,245
Cost:
$31,795
$2,885 67,116 $755 177 $6,619 1,379 $659 4,467 $19,327 - $2,885
67,116
kWh
$755
177
kW-months/year
$6,619
1,379
MMBtu
$659
4,467
lb
$19,327
-
$
TOTAL IMPLEMENTED Savings:
$13,211
Cost:
$26,769
$2,885 67,116 $755 177 $6,619 1,379 $432 1,200 $2,520 - $2,885
67,116
kWh
$755
177
kW-months/year
$6,619
1,379
MMBtu
$432
1,200
lb
$2,520
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes