IAC logo
IAC Assessment: IA0152
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0152
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1996
Principal Product tools and dies
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 225
Plant Area (Sq.Ft.) 250,000
Annual Production 500,000 Pieces
Production Hrs. Annual 2,600
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $113,406 3,239,449 kWh $0.04
Electricity Demand $7,128 10,284 kW-months/year $0.69
Natural Gas $67,129 23,297 MMBtu $2.88
TOTAL ENERGY COSTS $207,080
RECOMMENDED SAVINGS* $8,841 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $873
#|Description Savings
Cost
Status Electricity Usage Water Disposal Solid Waste (haz) Electricity Usage Water Disposal Solid Waste (haz)
$ kWh $ Tgal $ lb
01: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$3,833
Cost:
$2,450
- - - - $3,833 6,200 -
-
kWh
-
-
Tgal
$3,833
6,200
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,256
Cost:
$11,497
$2,256 64,478 - - - - $2,256
64,478
kWh
-
-
Tgal
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$230
Cost:
$384
$230 6,448 - - - - $230
6,448
kWh
-
-
Tgal
-
-
lb
04: 3.4151 MINIMIZE WATER USAGE Savings:
$1,649
Cost:
-
- - $1,649 789,750 - - -
-
kWh
$1,649
789,750
Tgal
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$873
Cost:
$328
$873 24,912 - - - - $873
24,912
kWh
-
-
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$8,841
Cost:
$14,659
$3,359 95,838 $1,649 789,750 $3,833 6,200 $3,359
95,838
kWh
$1,649
789,750
Tgal
$3,833
6,200
lb
TOTAL IMPLEMENTED Savings:
$873
Cost:
$328
$873 24,912 - - - - $873
24,912
kWh
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ Tgal $ lb