IAC Assessment: IA0157
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0157
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1996
Principal Product polyethylene pipe
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 74
Plant Area (Sq.Ft.) 150,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 8,568
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $308,721 13,273,154 kWh $0.02
Electricity Demand $195,985 25,500 kW-months/year $7.69
Natural Gas $20,126 4,780 MMBtu $4.21
TOTAL ENERGY COSTS $545,154
RECOMMENDED SAVINGS* $29,095 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,859
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,211
Cost:
$6,599
$1,550 66,530 $661 112 - - - - - - $1,550
66,530
kWh
$661
112
kW-months/year
-
-
lb
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$465
Cost:
$516
$343 14,654 $122 22 - - - - - - $343
14,654
kWh
$122
22
kW-months/year
-
-
lb
-
-
lb
-
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$945
Cost:
$260
$945 40,445 - - - - - - - - $945
40,445
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$971
Cost:
$2,560
$743 31,946 $228 38 - - - - - - $743
31,946
kWh
$228
38
kW-months/year
-
-
lb
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$697
Cost:
$222
$519 22,274 $178 30 - - - - - - $519
22,274
kWh
$178
30
kW-months/year
-
-
lb
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$623
Cost:
$160
$459 19,637 $164 28 - - - - - - $459
19,637
kWh
$164
28
kW-months/year
-
-
lb
-
-
lb
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,884
Cost:
$22,134
- - - - - - - - $11,884 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
lb
$11,884
-
$
08: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$6,291
Cost:
-
- - - - $6,291 15,000 - - - - -
-
kWh
-
-
kW-months/year
$6,291
15,000
lb
-
-
lb
-
-
$
09: 3.7121 IMPROVE HANDLING PRACTICES Savings:
$5,008
Cost:
$2,000
- - - - - - $5,008 6,253 - - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,008
6,253
lb
-
-
$
TOTAL RECOMMENDED Savings:
$29,095
Cost:
$34,451
$4,559 195,486 $1,353 230 $6,291 15,000 $5,008 6,253 $11,884 - $4,559
195,486
kWh
$1,353
230
kW-months/year
$6,291
15,000
lb
$5,008
6,253
lb
$11,884
-
$
TOTAL IMPLEMENTED Savings:
$21,859
Cost:
$34,191
$3,614 155,041 $1,353 230 - - $5,008 6,253 $11,884 - $3,614
155,041
kWh
$1,353
230
kW-months/year
-
-
lb
$5,008
6,253
lb
$11,884
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Solid Waste (haz) Administrative Changes