Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1996
Principal Product heat transfer products
NAICS n/a
SIC 3433 - Heating Equipment, Except Electric
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 110,000
Annual Production 5,000 Pieces
Production Hrs. Annual 4,000
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,299 2,869,578 kWh $0.02
Electricity Demand $42,004 7,536 kW-months/year $5.57
Natural Gas $72,124 18,020 MMBtu $4.00
TOTAL ENERGY COSTS $291,969
RECOMMENDED SAVINGS* $16,680 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,936
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,218
Cost:
$2,828
$1,051 50,996 $1,167 196 - - - - $1,051
50,996
kWh
$1,167
196
kW-months/year
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$400
Cost:
$1,380
$321 15,533 $79 47 - - - - $321
15,533
kWh
$79
47
kW-months/year
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,937
Cost:
$263
$1,221 59,203 $716 120 - - - - $1,221
59,203
kWh
$716
120
kW-months/year
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,326
Cost:
$25
$710 34,291 $616 103 - - - - $710
34,291
kWh
$616
103
kW-months/year
-
-
lb
-
-
$
05: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$4,200
Cost:
$4,200
- - - - - - $4,200 - -
-
kWh
-
-
kW-months/year
-
-
lb
$4,200
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,548
Cost:
$5,018
- - - - - - $1,548 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,548
-
$
07: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$5,051
Cost:
$25
- - - - $5,051 3,816 - - -
-
kWh
-
-
kW-months/year
$5,051
3,816
lb
-
-
$
TOTAL RECOMMENDED Savings:
$16,680
Cost:
$13,739
$3,303 160,023 $2,578 466 $5,051 3,816 $5,748 - $3,303
160,023
kWh
$2,578
466
kW-months/year
$5,051
3,816
lb
$5,748
-
$
TOTAL IMPLEMENTED Savings:
$8,936
Cost:
$6,686
$1,542 74,736 $795 167 $5,051 3,816 $1,548 - $1,542
74,736
kWh
$795
167
kW-months/year
$5,051
3,816
lb
$1,548
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (haz) Administrative Changes