Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1997 |
Principal Product | road construction equipment |
NAICS | n/a |
SIC | 3531 - Construction Machinery |
Sales | $10,000,000-$50,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 270,000 |
Annual Production | 250 Pieces |
Production Hrs. Annual | 5,460 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $87,797 | 3,063,013 | kWh | $0.03 |
Electricity Demand | $96,135 | 10,260 | kW-months/year | $9.37 |
Natural Gas | $59,913 | 15,060 | MMBtu | $3.98 |
TOTAL ENERGY COSTS | $243,845 | |||
RECOMMENDED SAVINGS* | $151,613 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $132,828 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING |
Savings: $111,000 Cost: $7,800 |
- | - | - | - | - | - | - | - | $111,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$111,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $20,790 Cost: $71,000 |
- | - | - | - | $(-12,210) | (-4,125) | $33,000 | - | - | - |
- - kWh |
- - kW-months/year |
$(-12,210) (-4,125) MMBtu |
$33,000 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,635 Cost: $18,214 |
$3,661 | 121,923 | $3,974 | 331 | - | - | - | - | - | - |
$3,661 121,923 kWh |
$3,974 331 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $7,537 Cost: $36,506 |
$3,631 | 201,641 | $3,906 | 732 | - | - | - | - | - | - |
$3,631 201,641 kWh |
$3,906 732 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,493 Cost: $1,484 |
$787 | 26,084 | $706 | 59 | - | - | - | - | - | - |
$787 26,084 kWh |
$706 59 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $775 Cost: $204 |
$441 | 15,826 | $334 | 31 | - | - | - | - | - | - |
$441 15,826 kWh |
$334 31 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,120 Cost: $25 |
$1,198 | 39,859 | $922 | 77 | - | - | - | - | - | - |
$1,198 39,859 kWh |
$922 77 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $263 Cost: $500 |
$167 | 9,086 | $96 | 18 | - | - | - | - | - | - |
$167 9,086 kWh |
$96 18 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $151,613 Cost: $135,733 |
$9,885 | 414,419 | $9,938 | 1,248 | $(-12,210) | (-4,125) | $33,000 | - | $111,000 | - | $9,885 414,419 kWh |
$9,938 1,248 kW-months/year |
$(-12,210) (-4,125) MMBtu |
$33,000 - $ |
$111,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $132,828 Cost: $79,504 |
$608 | 24,912 | $430 | 49 | $(-12,210) | (-4,125) | $33,000 | - | $111,000 | - | $608 24,912 kWh |
$430 49 kW-months/year |
$(-12,210) (-4,125) MMBtu |
$33,000 - $ |
$111,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Primary Raw Material |