IAC Assessment: IA0167
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0167
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1997
Principal Product road construction equipment
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 270,000
Annual Production 250 Pieces
Production Hrs. Annual 5,460
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,797 3,063,013 kWh $0.03
Electricity Demand $96,135 10,260 kW-months/year $9.37
Natural Gas $59,913 15,060 MMBtu $3.98
TOTAL ENERGY COSTS $243,845
RECOMMENDED SAVINGS* $151,613 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $132,828
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$111,000
Cost:
$7,800
- - - - - - - - $111,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$111,000
-
$
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$20,790
Cost:
$71,000
- - - - $(-12,210) (-4,125) $33,000 - - - -
-
kWh
-
-
kW-months/year
$(-12,210)
(-4,125)
MMBtu
$33,000
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,635
Cost:
$18,214
$3,661 121,923 $3,974 331 - - - - - - $3,661
121,923
kWh
$3,974
331
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,537
Cost:
$36,506
$3,631 201,641 $3,906 732 - - - - - - $3,631
201,641
kWh
$3,906
732
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,493
Cost:
$1,484
$787 26,084 $706 59 - - - - - - $787
26,084
kWh
$706
59
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$775
Cost:
$204
$441 15,826 $334 31 - - - - - - $441
15,826
kWh
$334
31
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,120
Cost:
$25
$1,198 39,859 $922 77 - - - - - - $1,198
39,859
kWh
$922
77
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$263
Cost:
$500
$167 9,086 $96 18 - - - - - - $167
9,086
kWh
$96
18
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$151,613
Cost:
$135,733
$9,885 414,419 $9,938 1,248 $(-12,210) (-4,125) $33,000 - $111,000 - $9,885
414,419
kWh
$9,938
1,248
kW-months/year
$(-12,210)
(-4,125)
MMBtu
$33,000
-
$
$111,000
-
$
TOTAL IMPLEMENTED Savings:
$132,828
Cost:
$79,504
$608 24,912 $430 49 $(-12,210) (-4,125) $33,000 - $111,000 - $608
24,912
kWh
$430
49
kW-months/year
$(-12,210)
(-4,125)
MMBtu
$33,000
-
$
$111,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material