IAC Assessment: IA0170
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0170
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1997
Principal Product cabinetry
NAICS n/a
SIC 2434 - Wood Kitchen Cabinets
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 183,462
Annual Production 65,000 Pieces
Production Hrs. Annual 2,168
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,920 3,327,081 kWh $0.03
Electricity Demand $99,556 13,788 kW-months/year $7.22
Natural Gas $133,034 36,484 MMBtu $3.65
TOTAL ENERGY COSTS $357,819
RECOMMENDED SAVINGS* $37,893 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,820
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$22,915
Cost:
$14,300
- - - - - - $911 113,832 $11,119 - - - $10,885 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$911
113,832
lb
$11,119
-
$
-
-
$
$10,885
-
$
02: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,431
Cost:
$7,179
- - - - - - $945 20,000 $(-134) - $4,620 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$945
20,000
lb
$(-134)
-
$
$4,620
-
$
-
-
$
03: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$4,158
Cost:
$11,000
- - - - $4,158 1,139 - - - - - - - - -
-
kWh
-
-
kW-months/year
$4,158
1,139
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,281
Cost:
$950
- - - - - - - - $2,281 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$2,281
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,097
Cost:
$826
$822 31,946 $1,275 176 - - - - - - - - - - $822
31,946
kWh
$1,275
176
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,011
Cost:
$1,704
$492 19,050 $519 72 - - - - - - - - - - $492
19,050
kWh
$519
72
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$37,893
Cost:
$35,959
$1,314 50,996 $1,794 248 $4,158 1,139 $1,856 133,832 $13,266 - $4,620 - $10,885 - $1,314
50,996
kWh
$1,794
248
kW-months/year
$4,158
1,139
MMBtu
$1,856
133,832
lb
$13,266
-
$
$4,620
-
$
$10,885
-
$
TOTAL IMPLEMENTED Savings:
$10,820
Cost:
$10,659
$1,314 50,996 $1,794 248 - - $945 20,000 $2,147 - $4,620 - - - $1,314
50,996
kWh
$1,794
248
kW-months/year
-
-
MMBtu
$945
20,000
lb
$2,147
-
$
$4,620
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Ancillary Material Cost