Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1997 |
Principal Product | yeast cultures |
NAICS | n/a |
SIC | 2048 - Prepared Feeds, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 950,000 Pounds |
Production Hrs. Annual | 6,000 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $149,753 | 6,032,825 | kWh | $0.02 |
Electricity Demand | $139,425 | 16,140 | kW-months/year | $8.64 |
TOTAL ENERGY COSTS | $299,258 | |||
RECOMMENDED SAVINGS* | $102,778 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $102,612 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Water Consumption | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Water Consumption | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $4,051 Cost: $1,100 |
$2,654 | 106,975 | $1,397 | 239 | - | - | - | - | - | - | - | - |
$2,654 106,975 kWh |
$1,397 239 kW-months/year |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,223 Cost: $1,915 |
$1,185 | 29,601 | $38 | 72 | - | - | - | - | - | - | - | - |
$1,185 29,601 kWh |
$38 72 kW-months/year |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $538 Cost: $50 |
$357 | 14,361 | $181 | 29 | - | - | - | - | - | - | - | - |
$357 14,361 kWh |
$181 29 kW-months/year |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $166 Cost: $630 |
$166 | 5,569 | - | - | - | - | - | - | - | - | - | - |
$166 5,569 kWh |
- - kW-months/year |
- - lb |
- - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $2,100 Cost: $8,100 |
- | - | - | - | $1,740 | 35,000 | - | - | - | - | $360 | - |
- - kWh |
- - kW-months/year |
$1,740 35,000 lb |
- - $ |
- - Tgal |
$360 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $3,700 Cost: $5,453 |
- | - | - | - | - | 3,590,664 | - | - | $3,700 | - | - | - |
- - kWh |
- - kW-months/year |
- 3,590,664 lb |
- - $ |
$3,700 - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.7121 IMPROVE HANDLING PRACTICES |
Savings: $91,000 Cost: $4,500 |
- | - | - | - | - | - | $91,000 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - lb |
$91,000 - $ |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $102,778 Cost: $21,748 |
$4,362 | 156,506 | $1,616 | 340 | $1,740 | 3,625,664 | $91,000 | - | $3,700 | - | $360 | - | $4,362 156,506 kWh |
$1,616 340 kW-months/year |
$1,740 3,625,664 lb |
$91,000 - $ |
$3,700 - Tgal |
$360 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $102,612 Cost: $21,118 |
$4,196 | 150,937 | $1,616 | 340 | $1,740 | 3,625,664 | $91,000 | - | $3,700 | - | $360 | - | $4,196 150,937 kWh |
$1,616 340 kW-months/year |
$1,740 3,625,664 lb |
$91,000 - $ |
$3,700 - Tgal |
$360 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Water Consumption | By-product Production | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Water Consumption | By-product Production |