IAC logo
IAC Assessment: IA0193
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0193
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1998
Principal Product custom plastic injection molding compounds
NAICS n/a
SIC 2821 - Plastics Materials And Resins
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 270,000
Annual Production 37,200,000 Pounds
Production Hrs. Annual 6,240
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $400,139 12,105,217 kWh $0.03
Electricity Demand $18,644 29,808 kW-months/year $0.63
Natural Gas $68,984 22,239 MMBtu $3.10
TOTAL ENERGY COSTS $542,337
RECOMMENDED SAVINGS* $153,804 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $73,342
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,856
Cost:
$4,248
$2,678 81,184 $1,178 157 - - - - - - - - - - $2,678
81,184
kWh
$1,178
157
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,240
Cost:
$9,348
$2,621 79,426 $1,619 216 - - - - - - - - - - $2,621
79,426
kWh
$1,619
216
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,418
Cost:
$399
$3,418 103,751 - - - - - - - - - - - - $3,418
103,751
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,458
Cost:
$1,000
- - - - $1,458 521 - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,458
521
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$587
Cost:
$1,110
$423 12,896 $164 25 - - - - - - - - - - $423
12,896
kWh
$164
25
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.7221 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL Savings:
$63,788
Cost:
$9,315
- - - - - - $788 63,000 - - $63,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$788
63,000
lb
-
-
$
$63,000
-
$
-
-
$
07: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$49,067
Cost:
$190,000
$(-1,690) (-51,290) $(-1,043) (-139) - - - - $51,800 - - - - - $(-1,690)
(-51,290)
kWh
$(-1,043)
(-139)
kW-months/year
-
-
MMBtu
-
-
lb
$51,800
-
$
-
-
$
-
-
$
08: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$27,390
Cost:
$10,000
- - - - - - - 96,000 $(-2,880) - - - $30,270 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
96,000
lb
$(-2,880)
-
$
-
-
$
$30,270
-
$
TOTAL RECOMMENDED Savings:
$153,804
Cost:
$225,420
$7,450 225,967 $1,918 259 $1,458 521 $788 159,000 $48,920 - $63,000 - $30,270 - $7,450
225,967
kWh
$1,918
259
kW-months/year
$1,458
521
MMBtu
$788
159,000
lb
$48,920
-
$
$63,000
-
$
$30,270
-
$
TOTAL IMPLEMENTED Savings:
$73,342
Cost:
$23,911
$5,299 160,610 $2,797 373 $1,458 521 $788 63,000 - - $63,000 - - - $5,299
160,610
kWh
$2,797
373
kW-months/year
$1,458
521
MMBtu
$788
63,000
lb
-
-
$
$63,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Primary Raw Material Ancillary Material Cost