IAC Assessment: IA0197
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0197
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1998
Principal Product folding cartons
NAICS n/a
SIC 2657 - Folding Paperboard Boxes
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 200,000
Annual Production 80,000 Tons
Production Hrs. Annual 6,240
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $207,507 7,850,821 kWh $0.03
Electricity Demand $114,222 18,456 kW-months/year $6.19
Natural Gas $58,211 14,078 MMBtu $4.13
TOTAL ENERGY COSTS $454,757
RECOMMENDED SAVINGS* $474,796 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 4.446 AUTOMATE FINISHING PROCESS Savings:
$234,000
Cost:
$280,000
- - - - - - - - $234,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$234,000
-
$
-
-
$
02: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$185,000
Cost:
$340,000
- - - - - - - - $185,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$185,000
-
$
-
-
$
03: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$22,403
Cost:
$27,855
- - - - $22,403 5,461 - - - - - - -
-
kWh
-
-
kW-months/year
$22,403
5,461
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$9,995
Cost:
$4,200
- - - - - - - - - - $9,995 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$9,995
-
$
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$8,880
Cost:
-
- - - - - - $8,880 120,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,880
120,000
lb
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,626
Cost:
$25
$3,875 148,007 $1,751 284 - - - - - - - - $3,875
148,007
kWh
$1,751
284
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,902
Cost:
$13,293
$2,351 89,683 $1,551 252 - - - - - - - - $2,351
89,683
kWh
$1,551
252
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,437
Cost:
$4,274
$1,676 63,892 $761 120 - - - - - - - - $1,676
63,892
kWh
$761
120
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,886
Cost:
$200
$1,295 48,945 $591 96 - - - - - - - - $1,295
48,945
kWh
$591
96
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$667
Cost:
$931
$667 25,498 - - - - - - - - - - $667
25,498
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$474,796
Cost:
$670,778
$9,864 376,025 $4,654 752 $22,403 5,461 $8,880 120,000 $419,000 - $9,995 - $9,864
376,025
kWh
$4,654
752
kW-months/year
$22,403
5,461
MMBtu
$8,880
120,000
lb
$419,000
-
$
$9,995
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes