IAC logo
IAC Assessment: IA0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1999
Principal Product steam turbines
NAICS n/a
SIC 3511 - Turbines And Turbine Generator Sets
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 134,000
Annual Production 50 Pieces
Production Hrs. Annual 6,240
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,001 3,627,198 kWh $0.02
Electricity Demand $62,118 9,936 kW-months/year $6.25
Natural Gas $85,006 28,841 MMBtu $2.95
TOTAL ENERGY COSTS $251,419
RECOMMENDED SAVINGS* $9,461 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,123
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,464
Cost:
$6,607
$617 26,964 $847 136 - - - - - - $617
26,964
kWh
$847
136
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$659
Cost:
$50
$480 21,102 $179 30 - - - - - - $480
21,102
kWh
$179
30
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
03: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$235
Cost:
$688
- - - - $235 81 - - - - -
-
kWh
-
-
kW-months/year
$235
81
MMBtu
-
-
Tgal
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$125
Cost:
$466
$125 5,569 - - - - - - - - $125
5,569
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
05: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$4,000
Cost:
$2,000
- - - - - - - - $4,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$4,000
-
$
06: 3.4157 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING Savings:
$2,978
Cost:
$150
- - - - - - $2,978 250,249 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,978
250,249
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$9,461
Cost:
$9,961
$1,222 53,635 $1,026 166 $235 81 $2,978 250,249 $4,000 - $1,222
53,635
kWh
$1,026
166
kW-months/year
$235
81
MMBtu
$2,978
250,249
Tgal
$4,000
-
$
TOTAL IMPLEMENTED Savings:
$2,123
Cost:
$6,657
$1,097 48,066 $1,026 166 - - - - - - $1,097
48,066
kWh
$1,026
166
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Ancillary Material Cost