Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1999
Principal Product washing machine transmissions
NAICS n/a
SIC 3633 - Household Laundry Equipment
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 75,000
Annual Production 950,000 Pieces
Production Hrs. Annual 6,240
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,980 5,129,250 kWh $0.03
Electricity Demand $193,716 14,256 kW-months/year $13.59
Natural Gas $35,638 8,070 MMBtu $4.42
TOTAL ENERGY COSTS $420,353
RECOMMENDED SAVINGS* $301,349 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $107,337
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,846
Cost:
$13,626
$4,163 162,075 $4,683 347 - - - - - - $4,163
162,075
kWh
$4,683
347
kW-months/year
-
-
Tgal
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,935
Cost:
$579
$1,460 56,858 $1,475 109 - - - - - - $1,460
56,858
kWh
$1,475
109
kW-months/year
-
-
Tgal
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$708
Cost:
$1,264
$708 27,550 - - - - - - - - $708
27,550
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$742
Cost:
$764
$369 14,361 $373 28 - - - - - - $369
14,361
kWh
$373
28
kW-months/year
-
-
Tgal
-
-
$
-
-
$
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$14,369
Cost:
$4,297
$(-144) (-5,569) $(-121) (-9) $17,134 6,965,211 $(-2,500) - - - $(-144)
(-5,569)
kWh
$(-121)
(-9)
kW-months/year
$17,134
6,965,211
Tgal
$(-2,500)
-
$
-
-
$
06: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$176,000
Cost:
$575,000
- - - - - - $176,000 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$176,000
-
$
-
-
$
07: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$97,749
Cost:
$800
- - - - - - $38,184 - $59,565 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$38,184
-
$
$59,565
-
$
TOTAL RECOMMENDED Savings:
$301,349
Cost:
$596,330
$6,556 255,275 $6,410 475 $17,134 6,965,211 $211,684 - $59,565 - $6,556
255,275
kWh
$6,410
475
kW-months/year
$17,134
6,965,211
Tgal
$211,684
-
$
$59,565
-
$
TOTAL IMPLEMENTED Savings:
$107,337
Cost:
$15,190
$4,532 176,436 $5,056 375 - - $38,184 - $59,565 - $4,532
176,436
kWh
$5,056
375
kW-months/year
-
-
Tgal
$38,184
-
$
$59,565
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost