IAC logo
IAC Assessment: IA0217
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0217
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1999
Principal Product wood doors and cabinetry
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 180,000
Annual Production 72,800 Pieces
Production Hrs. Annual 2,210
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,069 3,304,514 kWh $0.03
Electricity Demand $71,745 10,116 kW-months/year $7.09
Natural Gas $49,297 8,829 MMBtu $5.58
TOTAL ENERGY COSTS $254,111
RECOMMENDED SAVINGS* $43,755 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,780
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes By-product Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes By-product Production
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 2.1224 REPLACE BOILER Savings:
$22,643
Cost:
$12,000
- - - - $22,643 4,147 - - - - - - - - -
-
kWh
-
-
kW-months/year
$22,643
4,147
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,292
Cost:
$2,306
$596 22,274 $696 98 - - - - - - - - - - $596
22,274
kWh
$696
98
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,488
Cost:
$231
$647 24,033 $841 119 - - - - - - - - - - $647
24,033
kWh
$841
119
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$370
Cost:
$1,417
$158 5,862 $212 30 - - - - - - - - - - $158
5,862
kWh
$212
30
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$337
Cost:
$1,530
$337 12,603 - - - - - - - - - - - - $337
12,603
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$11,418
Cost:
$7,660
- - - - - - - - $6,732 306,000 $(-1,434) - $6,120 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$6,732
306,000
lb
$(-1,434)
-
$
$6,120
-
$
07: 3.3113 USE OTHER METHODS FOR NEUTRALIZATION Savings:
$6,207
Cost:
$100
- - - - - - $11,000 4,092 $(-4,793) 19,500 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,000
4,092
gal
$(-4,793)
19,500
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$43,755
Cost:
$25,244
$1,738 64,772 $1,749 247 $22,643 4,147 $11,000 4,092 $1,939 325,500 $(-1,434) - $6,120 - $1,738
64,772
kWh
$1,749
247
kW-months/year
$22,643
4,147
MMBtu
$11,000
4,092
gal
$1,939
325,500
lb
$(-1,434)
-
$
$6,120
-
$
TOTAL IMPLEMENTED Savings:
$2,780
Cost:
$2,537
$1,243 46,307 $1,537 217 - - - - - - - - - - $1,243
46,307
kWh
$1,537
217
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes By-product Production Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes By-product Production