IAC logo
IAC Assessment: IA0218
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0218
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1999
Principal Product waste management vehicles
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 100,000
Annual Production 364 Pieces
Production Hrs. Annual 2,600
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,888 882,767 kWh $0.06
Natural Gas $31,757 6,518 MMBtu $4.87
TOTAL ENERGY COSTS $83,645
RECOMMENDED SAVINGS* $17,781 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $420
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,310
Cost:
$14,754
$6,310 107,562 - - - - $6,310
107,562
kWh
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,756
Cost:
$20,756
$4,756 81,184 - - - - $4,756
81,184
kWh
-
-
MMBtu
-
-
lb
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,081
Cost:
$2,195
$2,081 35,463 - - - - $2,081
35,463
kWh
-
-
MMBtu
-
-
lb
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$876
Cost:
$87
- - $876 186 - - -
-
kWh
$876
186
MMBtu
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$151
Cost:
-
$151 2,638 - - - - $151
2,638
kWh
-
-
MMBtu
-
-
lb
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$420
Cost:
$272
$420 7,034 - - - - $420
7,034
kWh
-
-
MMBtu
-
-
lb
07: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$3,187
Cost:
$2,656
- - - - $3,187 3,230 -
-
kWh
-
-
MMBtu
$3,187
3,230
lb
TOTAL RECOMMENDED Savings:
$17,781
Cost:
$40,720
$13,718 233,881 $876 186 $3,187 3,230 $13,718
233,881
kWh
$876
186
MMBtu
$3,187
3,230
lb
TOTAL IMPLEMENTED Savings:
$420
Cost:
$272
$420 7,034 - - - - $420
7,034
kWh
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)