Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1999 |
Principal Product | vending machines |
NAICS | n/a |
SIC | 3581 - Automatic Vending Machines |
Sales | $50,000,000-$100,000,000 |
# of Employees | 425 |
Plant Area (Sq.Ft.) | 375,000 |
Annual Production | 30,000 Pieces |
Production Hrs. Annual | 7,056 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $108,409 | 4,087,339 | kWh | $0.03 |
Electricity Demand | $79,016 | 11,352 | kW-months/year | $6.96 |
Natural Gas | $106,250 | 21,802 | MMBtu | $4.87 |
TOTAL ENERGY COSTS | $311,099 | |||
RECOMMENDED SAVINGS* | $146,692 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $9,307 Cost: $2,670 |
$(-55) | (-1,465) | - | - | $9,362 | 3,657 | - | - | - | - | - | - |
$(-55) (-1,465) kWh |
- - kW-months/year |
$9,362 3,657 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,129 Cost: $275 |
$1,319 | 50,410 | $810 | 86 | - | - | - | - | - | - | - | - |
$1,319 50,410 kWh |
$810 86 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,841 Cost: - |
$671 | 25,791 | $1,170 | 125 | - | - | - | - | - | - | - | - |
$671 25,791 kWh |
$1,170 125 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,282 Cost: $653 |
$797 | 30,481 | $485 | 53 | - | - | - | - | - | - | - | - |
$797 30,481 kWh |
$485 53 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $741 Cost: $50 |
$460 | 17,585 | $281 | 30 | - | - | - | - | - | - | - | - |
$460 17,585 kWh |
$281 30 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $144 Cost: $732 |
$144 | 5,569 | - | - | - | - | - | - | - | - | - | - |
$144 5,569 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $17,424 Cost: $7,400 |
- | - | - | - | - | - | $17,424 | 588,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$17,424 588,000 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $70,029 Cost: $25,372 |
- | - | - | - | - | - | - | - | $70,029 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$70,029 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $40,016 Cost: $218 |
- | - | - | - | - | - | - | - | $40,016 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$40,016 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $3,779 Cost: $1,400 |
- | - | - | - | - | - | - | - | - | - | $3,779 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$3,779 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $146,692 Cost: $38,770 |
$3,336 | 128,371 | $2,746 | 294 | $9,362 | 3,657 | $17,424 | 588,000 | $110,045 | - | $3,779 | - | $3,336 128,371 kWh |
$2,746 294 kW-months/year |
$9,362 3,657 MMBtu |
$17,424 588,000 lb |
$110,045 - $ |
$3,779 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Ancillary Material Cost |