IAC logo
IAC Assessment: IA0229
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0229
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1999
Principal Product Aerial Boom Lifts
NAICS n/a
SIC 3531 - Construction Machinery
Sales $10,000,000-$50,000,000
# of Employees 275
Plant Area (Sq.Ft.) 221,000
Annual Production 960 Pieces
Production Hrs. Annual 6,000
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $87,278 3,387,456 kWh $0.03
Electricity Demand $27,130 9,036 kW-months/year $3.00
Natural Gas $78,154 16,404 MMBtu $4.76
TOTAL ENERGY COSTS $208,171
RECOMMENDED SAVINGS* $569,360 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,046
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Gaseous Waste Personnel Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Gaseous Waste Personnel Changes
$ kWh $ kW-months/year $ gal $ lb $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,090
Cost:
$294
$877 34,877 $213 79 - - - - - - - - $877
34,877
kWh
$213
79
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$360
Cost:
$30
$299 11,723 $61 23 - - - - - - - - $299
11,723
kWh
$61
23
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,122
Cost:
-
$5,079 201,641 $1,043 388 - - - - - - - - $5,079
201,641
kWh
$1,043
388
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$399
Cost:
$1,324
$331 13,189 $68 25 - - - - - - - - $331
13,189
kWh
$68
25
kW-months/year
-
-
gal
-
-
lb
-
-
lb
-
-
$
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$540,000
Cost:
$1,501,800
- - - - - - - - - - $540,000 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
lb
$540,000
-
$
06: 3.3113 USE OTHER METHODS FOR NEUTRALIZATION Savings:
$12,382
Cost:
$7,990
$(-56) (-2,345) $(-161) (-60) $12,599 1,760 - - - - - - $(-56)
(-2,345)
kWh
$(-161)
(-60)
kW-months/year
$12,599
1,760
gal
-
-
lb
-
-
lb
-
-
$
07: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$4,907
Cost:
$200
- - - - - - $4,907 175 - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$4,907
175
lb
-
-
lb
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,144
Cost:
$7,480
- - - - - - $3,144 48,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$3,144
48,000
lb
-
-
lb
-
-
$
09: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS Savings:
$956
Cost:
$143
- - - - - - - - $956 3,470 - - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$956
3,470
lb
-
-
$
TOTAL RECOMMENDED Savings:
$569,360
Cost:
$1,519,261
$6,530 259,085 $1,224 455 $12,599 1,760 $8,051 48,175 $956 3,470 $540,000 - $6,530
259,085
kWh
$1,224
455
kW-months/year
$12,599
1,760
gal
$8,051
48,175
lb
$956
3,470
lb
$540,000
-
$
TOTAL IMPLEMENTED Savings:
$2,046
Cost:
$437
$877 34,877 $213 79 - - - - $956 3,470 - - $877
34,877
kWh
$213
79
kW-months/year
-
-
gal
-
-
lb
$956
3,470
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ lb $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Gaseous Waste Personnel Changes Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Gaseous Waste Personnel Changes