Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 1999 |
Principal Product | Aerial Boom Lifts |
NAICS | n/a |
SIC | 3531 - Construction Machinery |
Sales | $10,000,000-$50,000,000 |
# of Employees | 275 |
Plant Area (Sq.Ft.) | 221,000 |
Annual Production | 960 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $87,278 | 3,387,456 | kWh | $0.03 |
Electricity Demand | $27,130 | 9,036 | kW-months/year | $3.00 |
Natural Gas | $78,154 | 16,404 | MMBtu | $4.76 |
TOTAL ENERGY COSTS | $208,171 | |||
RECOMMENDED SAVINGS* | $569,360 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,046 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Gaseous Waste | Personnel Changes | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Gaseous Waste | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,090 Cost: $294 |
$877 | 34,877 | $213 | 79 | - | - | - | - | - | - | - | - |
$877 34,877 kWh |
$213 79 kW-months/year |
- - gal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $360 Cost: $30 |
$299 | 11,723 | $61 | 23 | - | - | - | - | - | - | - | - |
$299 11,723 kWh |
$61 23 kW-months/year |
- - gal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,122 Cost: - |
$5,079 | 201,641 | $1,043 | 388 | - | - | - | - | - | - | - | - |
$5,079 201,641 kWh |
$1,043 388 kW-months/year |
- - gal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $399 Cost: $1,324 |
$331 | 13,189 | $68 | 25 | - | - | - | - | - | - | - | - |
$331 13,189 kWh |
$68 25 kW-months/year |
- - gal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $540,000 Cost: $1,501,800 |
- | - | - | - | - | - | - | - | - | - | $540,000 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
- - lb |
$540,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.3113 USE OTHER METHODS FOR NEUTRALIZATION |
Savings: $12,382 Cost: $7,990 |
$(-56) | (-2,345) | $(-161) | (-60) | $12,599 | 1,760 | - | - | - | - | - | - |
$(-56) (-2,345) kWh |
$(-161) (-60) kW-months/year |
$12,599 1,760 gal |
- - lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $4,907 Cost: $200 |
- | - | - | - | - | - | $4,907 | 175 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$4,907 175 lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $3,144 Cost: $7,480 |
- | - | - | - | - | - | $3,144 | 48,000 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$3,144 48,000 lb |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.7312 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS |
Savings: $956 Cost: $143 |
- | - | - | - | - | - | - | - | $956 | 3,470 | - | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
$956 3,470 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $569,360 Cost: $1,519,261 |
$6,530 | 259,085 | $1,224 | 455 | $12,599 | 1,760 | $8,051 | 48,175 | $956 | 3,470 | $540,000 | - | $6,530 259,085 kWh |
$1,224 455 kW-months/year |
$12,599 1,760 gal |
$8,051 48,175 lb |
$956 3,470 lb |
$540,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,046 Cost: $437 |
$877 | 34,877 | $213 | 79 | - | - | - | - | $956 | 3,470 | - | - | $877 34,877 kWh |
$213 79 kW-months/year |
- - gal |
- - lb |
$956 3,470 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Gaseous Waste | Personnel Changes | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Gaseous Waste | Personnel Changes |