IAC logo
IAC Assessment: IA0230
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0230
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1999
Principal Product horse and livestock trailers
NAICS n/a
SIC 3799 - Transportation Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 100,000
Annual Production 2,200 Pieces
Production Hrs. Annual 2,250
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,689 735,932 kWh $0.04
Electricity Demand $20,214 3,408 kW-months/year $5.93
Natural Gas $47,708 11,761 MMBtu $4.06
TOTAL ENERGY COSTS $99,861
RECOMMENDED SAVINGS* $29,033 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,900
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,917
Cost:
$5,903
$1,042 27,843 $875 148 - - - - - - - - $1,042
27,843
kWh
$875
148
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,526
Cost:
-
$829 21,981 $697 118 - - - - - - - - $829
21,981
kWh
$697
118
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$387
Cost:
$798
$387 10,258 - - - - - - - - - - $387
10,258
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,152
Cost:
$257
$625 16,706 $527 89 - - - - - - - - $625
16,706
kWh
$527
89
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$847
Cost:
$1,105
- - - - $847 89 - - - - - - -
-
kWh
-
-
kW-months/year
$847
89
MMBtu
-
-
lb
-
-
$
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$900
Cost:
$100
- - - - - - $900 84,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$900
84,000
lb
-
-
$
-
-
$
07: 3.5218 REUSE / RECYCLE/ SELL RUBBER PRODUCTS Savings:
$625
Cost:
$50
- - - - - - $625 25,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$625
25,000
lb
-
-
$
-
-
$
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$253
Cost:
$50
- - - - - - - - - - $253 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$253
-
$
09: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$16,258
Cost:
$7,853
- - - - - - - - - - $16,258 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$16,258
-
$
10: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$3,710
Cost:
$6,923
- - - - - - - - - - $3,710 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$3,710
-
$
11: 4.1310 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$1,458
Cost:
$50
- - - - - - - - $2,219 - $(-761) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$2,219
-
$
$(-761)
-
$
TOTAL RECOMMENDED Savings:
$29,033
Cost:
$23,089
$2,883 76,788 $2,099 355 $847 89 $1,525 109,000 $2,219 - $19,460 - $2,883
76,788
kWh
$2,099
355
kW-months/year
$847
89
MMBtu
$1,525
109,000
lb
$2,219
-
$
$19,460
-
$
TOTAL IMPLEMENTED Savings:
$6,900
Cost:
$7,315
$2,496 66,530 $2,099 355 $847 89 - - $2,219 - $(-761) - $2,496
66,530
kWh
$2,099
355
kW-months/year
$847
89
MMBtu
-
-
lb
$2,219
-
$
$(-761)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Ancillary Material Cost