IAC Assessment: IA0232
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0232
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1999
Principal Product truck bodies, hoists
NAICS n/a
SIC 3713 - Truck And Bus Bodies
Sales $10,000,000-$50,000,000
# of Employees 260
Plant Area (Sq.Ft.) 500,000
Annual Production 0 Pieces
Production Hrs. Annual 4,550
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,897 3,114,009 kWh $0.05
Electricity Demand $43,127 12,456 kW-months/year $3.46
Natural Gas $90,124 20,947 MMBtu $4.30
TOTAL ENERGY COSTS $295,530
RECOMMENDED SAVINGS* $235,651 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,718
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Primary Raw Material
$ kWh $ kW-months/year $ gal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,704
Cost:
$13,064
$3,357 90,270 $2,347 421 - - - - - - $3,357
90,270
kWh
$2,347
421
kW-months/year
-
-
gal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,087
Cost:
$445
$1,151 36,049 $936 168 - - - - - - $1,151
36,049
kWh
$936
168
kW-months/year
-
-
gal
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,827
Cost:
$537
$1,058 28,429 $769 138 - - - - - - $1,058
28,429
kWh
$769
138
kW-months/year
-
-
gal
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$704
Cost:
$828
$395 10,844 $309 53 - - - - - - $395
10,844
kWh
$309
53
kW-months/year
-
-
gal
-
-
$
-
-
$
05: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$150,000
Cost:
$28,000
- - - - - - - - $150,000 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$150,000
-
$
06: 3.8143 RECYCLE CLEANING SOLVENT AND REUSE Savings:
$33,891
Cost:
$10,300
- - $(-241) (-43) $13,942 3,600 $(-4,830) - $25,020 - -
-
kWh
$(-241)
(-43)
kW-months/year
$13,942
3,600
gal
$(-4,830)
-
$
$25,020
-
$
07: 3.2161 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE Savings:
$9,540
Cost:
$16,088
- - - - - - - - $9,540 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$9,540
-
$
08: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$31,898
Cost:
$175,500
- - - - - - $31,898 - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$31,898
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$235,651
Cost:
$244,762
$5,961 165,592 $4,120 737 $13,942 3,600 $27,068 - $184,560 - $5,961
165,592
kWh
$4,120
737
kW-months/year
$13,942
3,600
gal
$27,068
-
$
$184,560
-
$
TOTAL IMPLEMENTED Savings:
$35,718
Cost:
$10,837
$1,058 28,429 $528 95 $13,942 3,600 $(-4,830) - $25,020 - $1,058
28,429
kWh
$528
95
kW-months/year
$13,942
3,600
gal
$(-4,830)
-
$
$25,020
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Primary Raw Material Electricity Usage Electricity Demand Other Liquid (haz) Personnel Changes Primary Raw Material