IAC Assessment: IA0237
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0237
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 1999
Principal Product custom forms
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 92,500
Annual Production 15,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $42,341 4,471,864 kWh $0.01
Electricity Demand $204,141 7,692 kW-months/year $26.54
Natural Gas $23,078 5,883 MMBtu $3.92
TOTAL ENERGY COSTS $271,240
RECOMMENDED SAVINGS* $75,725 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,880
Cost:
$1,142
- - - - - - $6,880 1,780 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$6,880
1,780
MMBtu
-
-
gal
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,608
Cost:
$945
$263 28,429 $1,345 47 - - - - - - - - $263
28,429
kWh
$1,345
47
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,447
Cost:
$264
$421 22,274 $1,026 36 - - - - - - - - $421
22,274
kWh
$1,026
36
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,914
Cost:
$8,729
$750 39,566 $5,164 181 - - - - - - - - $750
39,566
kWh
$5,164
181
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,891
Cost:
-
$1,437 75,615 $3,454 121 - - - - - - - - $1,437
75,615
kWh
$3,454
121
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$247
Cost:
$466
$247 12,896 - - - - - - - - - - $247
12,896
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
07: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$7,704
Cost:
$10,300
- - - - $(-19) - - - $8,727 1,040 $(-1,004) - -
-
kWh
-
-
kW-months/year
$(-19)
-
$
-
-
MMBtu
$8,727
1,040
gal
$(-1,004)
-
$
08: 4.444 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$47,034
Cost:
$3,932
- - - - - - - - - - $47,034 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$47,034
-
$
TOTAL RECOMMENDED Savings:
$75,725
Cost:
$25,778
$3,118 178,780 $10,989 385 $(-19) - $6,880 1,780 $8,727 1,040 $46,030 - $3,118
178,780
kWh
$10,989
385
kW-months/year
$(-19)
-
$
$6,880
1,780
MMBtu
$8,727
1,040
gal
$46,030
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Personnel Changes