IAC logo
IAC Assessment: IA0239
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0239
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2000
Principal Product cometic brushes
NAICS n/a
SIC 3991 - Brooms And Brushes
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 55,000
Annual Production 727,500,000 Pieces
Production Hrs. Annual 6,240
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,100 2,286,929 kWh $0.04
Electricity Demand $23,000 5,676 kW-months/year $4.05
Natural Gas $27,900 8,152 MMBtu $3.42
TOTAL ENERGY COSTS $147,632
RECOMMENDED SAVINGS* $209,166 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,334
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$364
Cost:
-
$106 2,345 $258 64 - - - - - - - - $106
2,345
kWh
$258
64
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$59
Cost:
$783
$20 293 $39 10 - - - - - - - - $20
293
kWh
$39
10
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$981
Cost:
$264
$328 7,327 $653 161 - - - - - - - - $328
7,327
kWh
$653
161
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$436
Cost:
$130
$144 3,224 $292 54 - - - - - - - - $144
3,224
kWh
$292
54
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$3,777
Cost:
$1,142
- - - - $3,777 1,191 - - - - - - -
-
kWh
-
-
kW-months/year
$3,777
1,191
MMBtu
-
-
gal
-
-
$
-
-
$
06: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$2,140
Cost:
$9,600
- - - - - - $2,140 832 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,140
832
gal
-
-
$
-
-
$
07: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT Savings:
$7,353
Cost:
$125
- - - - - - - - - - $7,353 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$7,353
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$187,200
Cost:
$234,048
- - - - - - - - $187,200 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$187,200
-
$
-
-
$
09: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$6,856
Cost:
$7,990
- - - - - - - - - - $6,856 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$6,856
-
$
TOTAL RECOMMENDED Savings:
$209,166
Cost:
$254,082
$598 13,189 $1,242 289 $3,777 1,191 $2,140 832 $187,200 - $14,209 - $598
13,189
kWh
$1,242
289
kW-months/year
$3,777
1,191
MMBtu
$2,140
832
gal
$187,200
-
$
$14,209
-
$
TOTAL IMPLEMENTED Savings:
$8,334
Cost:
$389
$328 7,327 $653 161 - - - - - - $7,353 - $328
7,327
kWh
$653
161
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
$7,353
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Administrative Changes