IAC Assessment: IA0244
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0244
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2000
Principal Product Fuel Injection Nozzles
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 126
Plant Area (Sq.Ft.) 150,000
Annual Production 416,250 Pieces
Production Hrs. Annual 7,200
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,619 2,271,981 kWh $0.03
Electricity Demand $16,135 4,788 kW-months/year $3.37
Natural Gas $2,094 424 MMBtu $4.94
TOTAL ENERGY COSTS $110,836
RECOMMENDED SAVINGS* $15,260 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,187
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ gal $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$500
Cost:
$58
$315 14,361 $185 23 - - - - - - $315
14,361
kWh
$185
23
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$478
Cost:
$164
$307 13,775 $171 23 - - - - - - $307
13,775
kWh
$171
23
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$128
Cost:
$137
$79 3,517 $49 6 - - - - - - $79
3,517
kWh
$49
6
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,657
Cost:
-
$1,042 47,186 $615 76 - - - - - - $1,042
47,186
kWh
$615
76
kW-months/year
-
-
Tgal
-
-
gal
-
-
$
05: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$7,765
Cost:
$16,000
$(-32) (-1,465) $(-68) (-8) - - $7,865 3,960 - - $(-32)
(-1,465)
kWh
$(-68)
(-8)
kW-months/year
-
-
Tgal
$7,865
3,960
gal
-
-
$
06: 3.4151 MINIMIZE WATER USAGE Savings:
$4,559
Cost:
$9,800
- - - - $4,559 3,039 - - - - -
-
kWh
-
-
kW-months/year
$4,559
3,039
Tgal
-
-
gal
-
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$173
Cost:
$72
- - - - - - - - $173 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
gal
$173
-
$
TOTAL RECOMMENDED Savings:
$15,260
Cost:
$26,231
$1,711 77,374 $952 120 $4,559 3,039 $7,865 3,960 $173 - $1,711
77,374
kWh
$952
120
kW-months/year
$4,559
3,039
Tgal
$7,865
3,960
gal
$173
-
$
TOTAL IMPLEMENTED Savings:
$5,187
Cost:
$9,995
$394 17,878 $234 29 $4,559 3,039 - - - - $394
17,878
kWh
$234
29
kW-months/year
$4,559
3,039
Tgal
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ gal $ $
Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Other Liquid (non-haz) Ancillary Material Cost