IAC logo
IAC Assessment: IA0253
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0253
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2000
Principal Product steel agricultural tillage tools
NAICS n/a
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 144,000
Annual Production 10,000 Tons
Production Hrs. Annual 3,600
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,955 2,942,556 kWh $0.02
Electricity Demand $127,083 9,708 kW-months/year $13.09
Natural Gas $134,287 58,196 MMBtu $2.31
TOTAL ENERGY COSTS $333,325
RECOMMENDED SAVINGS* $99,546 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,005
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$47,476
Cost:
-
- - - - $47,476 - - - - - -
-
kWh
-
-
kW-months/year
$47,476
-
$
-
-
$
-
-
$
02: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$12,000
Cost:
$14,500
- - - - - - $12,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$12,000
-
$
-
-
$
03: 4.3220 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL Savings:
$33,000
Cost:
$20,000
- - - - $33,000 - - - - - -
-
kWh
-
-
kW-months/year
$33,000
-
$
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,349
Cost:
-
$1,220 48,652 $2,129 162 - - - - - - $1,220
48,652
kWh
$2,129
162
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,005
Cost:
$158
$728 29,015 $1,277 97 - - - - - - $728
29,015
kWh
$1,277
97
kW-months/year
-
-
$
-
-
$
-
-
$
06: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$1,716
Cost:
$6
- - - - - - - - $1,716 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$1,716
-
$
TOTAL RECOMMENDED Savings:
$99,546
Cost:
$34,664
$1,948 77,667 $3,406 259 $80,476 - $12,000 - $1,716 - $1,948
77,667
kWh
$3,406
259
kW-months/year
$80,476
-
$
$12,000
-
$
$1,716
-
$
TOTAL IMPLEMENTED Savings:
$14,005
Cost:
$14,658
$728 29,015 $1,277 97 - - $12,000 - - - $728
29,015
kWh
$1,277
97
kW-months/year
-
-
$
$12,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost