Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2000 |
Principal Product | livestock food supplements |
NAICS | n/a |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 45,000 Tons |
Production Hrs. Annual | 8,736 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $136,931 | 3,644,197 | kWh | $0.04 |
Electricity Demand | $42,359 | 7,188 | kW-months/year | $5.89 |
Natural Gas | $20,985 | 4,099 | MMBtu | $5.12 |
TOTAL ENERGY COSTS | $202,342 | |||
RECOMMENDED SAVINGS* | $406,159 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,467 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,574 Cost: $8,062 |
$2,751 | 106,682 | $1,823 | 164 | - | - | - | - | - | - | - | - | - | - |
$2,751 106,682 kWh |
$1,823 164 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,401 Cost: $144 |
$879 | 33,998 | $522 | 47 | - | - | - | - | - | - | - | - | - | - |
$879 33,998 kWh |
$522 47 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,260 Cost: - |
$793 | 30,774 | $467 | 42 | - | - | - | - | - | - | - | - | - | - |
$793 30,774 kWh |
$467 42 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $670 Cost: $665 |
$670 | 25,791 | - | - | - | - | - | - | - | - | - | - | - | - |
$670 25,791 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,240 Cost: $2,514 |
- | - | - | - | $2,240 | 460 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,240 460 MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $880 Cost: $163 |
$558 | 21,688 | $322 | 30 | - | - | - | - | - | - | - | - | - | - |
$558 21,688 kWh |
$322 30 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $358 Cost: $25 |
$225 | 8,792 | $133 | 12 | - | - | - | - | - | - | - | - | - | - |
$225 8,792 kWh |
$133 12 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $4,942 Cost: $4,463 |
- | - | - | - | $3,161 | 649 | $879 | 441,210 | - | - | - | - | $902 | - |
- - kWh |
- - kW-months/year |
$3,161 649 MMBtu |
$879 441,210 Tgal |
- - $ |
- - $ |
$902 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $323,237 Cost: $750,000 |
$(-16,814) | (-651,817) | $(-9,949) | (-895) | - | - | - | - | - | - | $350,000 | - | - | - |
$(-16,814) (-651,817) kWh |
$(-9,949) (-895) kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
$350,000 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS |
Savings: $43,847 Cost: $35,000 |
$(-353) | (-13,482) | - | - | - | - | - | - | $13,000 | - | $31,200 | - | - | - |
$(-353) (-13,482) kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$13,000 - $ |
$31,200 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $22,750 Cost: $50,000 |
- | - | - | - | - | - | - | - | $22,750 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$22,750 - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $406,159 Cost: $851,036 |
$(-11,291) | (-437,574) | $(-6,682) | (-600) | $5,401 | 1,109 | $879 | 441,210 | $35,750 | - | $381,200 | - | $902 | - | $(-11,291) (-437,574) kWh |
$(-6,682) (-600) kW-months/year |
$5,401 1,109 MMBtu |
$879 441,210 Tgal |
$35,750 - $ |
$381,200 - $ |
$902 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,467 Cost: $13,497 |
$4,858 | 188,159 | $2,667 | 241 | $3,161 | 649 | $879 | 441,210 | - | - | - | - | $902 | - | $4,858 188,159 kWh |
$2,667 241 kW-months/year |
$3,161 649 MMBtu |
$879 441,210 Tgal |
- - $ |
- - $ |
$902 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Administrative Changes | Water Consumption |