Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2001 |
Principal Product | Aluminum castings |
NAICS | n/a |
SIC | 3363 - Aluminum Die-castings |
Sales | $1,000,000-$5,000,000 |
# of Employees | 29 |
Plant Area (Sq.Ft.) | 27,500 |
Annual Production | 2,000,000 Pounds |
Production Hrs. Annual | 4,080 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $38,212 | 1,049,700 | kWh | $0.04 |
Electricity Demand | $18,342 | 3,120 | kW-months/year | $5.88 |
Natural Gas | $88,420 | 12,952 | MMBtu | $6.83 |
TOTAL ENERGY COSTS | $160,056 | |||
RECOMMENDED SAVINGS* | $26,759 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,058 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,819 Cost: $182 |
$987 | 33,905 | $832 | 100 | - | - | - | - | - | - |
$987 33,905 kWh |
$832 100 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $394 Cost: $18 |
$214 | 7,344 | $180 | 22 | - | - | - | - | - | - |
$214 7,344 kWh |
$180 22 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $216 Cost: $213 |
$116 | 3,991 | $100 | 12 | - | - | - | - | - | - |
$116 3,991 kWh |
$100 12 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING |
Savings: $4,016 Cost: $800 |
- | - | - | - | $4,016 | 618 | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,016 618 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $613 Cost: $159 |
$332 | 11,424 | $281 | 34 | - | - | - | - | - | - |
$332 11,424 kWh |
$281 34 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $256 Cost: $633 |
$116 | 3,998 | $140 | 17 | - | - | - | - | - | - |
$116 3,998 kWh |
$140 17 kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $99 Cost: $222 |
$99 | 3,416 | - | - | - | - | - | - | - | - |
$99 3,416 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $19,346 Cost: $43,176 |
$(-1,686) | (-57,936) | $(-1,424) | (-170) | - | - | $12,973 | 5,675,112 | $9,483 | - |
$(-1,686) (-57,936) kWh |
$(-1,424) (-170) kW-months/year |
- - MMBtu |
$12,973 5,675,112 Tgal |
$9,483 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,759 Cost: $45,403 |
$178 | 6,142 | $109 | 15 | $4,016 | 618 | $12,973 | 5,675,112 | $9,483 | - | $178 6,142 kWh |
$109 15 kW-months/year |
$4,016 618 MMBtu |
$12,973 5,675,112 Tgal |
$9,483 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,058 Cost: $1,372 |
$1,649 | 56,664 | $1,393 | 168 | $4,016 | 618 | - | - | - | - | $1,649 56,664 kWh |
$1,393 168 kW-months/year |
$4,016 618 MMBtu |
- - Tgal |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Water Consumption |