IAC logo
IAC Assessment: IA0286
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0286
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2002
Principal Product Corrugated containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 260,000
Annual Production 125,250,000 Pounds
Production Hrs. Annual 7,488
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,903 5,814,000 kWh $0.03
Electricity Demand $97,072 12,900 kW-months/year $7.52
Natural Gas $285,522 49,833 MMBtu $5.73
Fuel Oil #2 $74,902 10,572 MMBtu $7.08
TOTAL ENERGY COSTS $655,831
RECOMMENDED SAVINGS* $31,478 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,917
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,555
Cost:
$434
$3,131 88,435 $1,424 151 - - $3,131
88,435
kWh
$1,424
151
kW-months/year
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,616
Cost:
$250
$1,128 31,872 $488 52 - - $1,128
31,872
kWh
$488
52
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,022
Cost:
$25
$716 20,218 $306 32 - - $716
20,218
kWh
$306
32
kW-months/year
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,353
Cost:
$3,186
$1,353 38,227 - - - - $1,353
38,227
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,465
Cost:
$16,361
$5,630 159,039 $2,835 300 - - $5,630
159,039
kWh
$2,835
300
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,320
Cost:
-
$1,625 45,903 $695 74 - - $1,625
45,903
kWh
$695
74
kW-months/year
-
-
MMBtu
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,270
Cost:
$1,500
$1,590 44,928 $680 72 - - $1,590
44,928
kWh
$680
72
kW-months/year
-
-
MMBtu
08: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$2,691
Cost:
$1,000
- - - - $2,691 491 -
-
kWh
-
-
kW-months/year
$2,691
491
MMBtu
09: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$2,570
Cost:
$3,500
- - - - $2,570 469 -
-
kWh
-
-
kW-months/year
$2,570
469
MMBtu
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,028
Cost:
$2,680
- - - - $6,028 1,100 -
-
kWh
-
-
kW-months/year
$6,028
1,100
MMBtu
11: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$(-1,412)
Cost:
$80,000
$(-989) (-27,930) $(-423) (-45) - - $(-989)
(-27,930)
kWh
$(-423)
(-45)
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$31,478
Cost:
$108,936
$14,184 400,692 $6,005 636 $11,289 2,060 $14,184
400,692
kWh
$6,005
636
kW-months/year
$11,289
2,060
MMBtu
TOTAL IMPLEMENTED Savings:
$21,917
Cost:
$19,545
$13,104 370,177 $6,122 649 $2,691 491 $13,104
370,177
kWh
$6,122
649
kW-months/year
$2,691
491
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas