Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2003
Principal Product Kiln-dried hardwoods, hardwood floorings
NAICS 321918 - Other Millwork (including Flooring)
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 200,000
Annual Production 0 Units
Production Hrs. Annual 3,500
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,267 2,310,303 kWh $0.03
Electricity Demand $88,523 10,932 kW-months/year $8.10
Natural Gas $4,585 743 MMBtu $6.17
TOTAL ENERGY COSTS $158,230
RECOMMENDED SAVINGS* $17,816 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,996
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,364
Cost:
$157
$722 26,460 $642 91 - - $722
26,460
kWh
$642
91
kW-months/year
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$936
Cost:
$446
$497 18,197 $439 65 - - $497
18,197
kWh
$439
65
kW-months/year
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$572
Cost:
$712
$303 11,095 $269 38 - - $303
11,095
kWh
$269
38
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$632
Cost:
$124
$390 14,271 $242 34 - - $390
14,271
kWh
$242
34
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,661
Cost:
$6,189
$1,387 50,812 $1,274 180 - - $1,387
50,812
kWh
$1,274
180
kW-months/year
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,651
Cost:
$20,000
- - - - $11,651 - -
-
kWh
-
-
kW-months/year
$11,651
-
$
TOTAL RECOMMENDED Savings:
$17,816
Cost:
$27,628
$3,299 120,835 $2,866 408 $11,651 - $3,299
120,835
kWh
$2,866
408
kW-months/year
$11,651
-
$
TOTAL IMPLEMENTED Savings:
$1,996
Cost:
$281
$1,112 40,731 $884 125 - - $1,112
40,731
kWh
$884
125
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees