IAC logo
IAC Assessment: IA0341
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0341
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2004
Principal Product agriculatural sprayers and detasslers
NAICS 333111 - Farm Machinery and Equipment Manufacturing
SIC 3523 - Farm Machinery And Equipment
Sales $10,000,000-$50,000,000
# of Employees 116
Plant Area (Sq.Ft.) 88,000
Annual Production 200 Pieces
Production Hrs. Annual 2,782
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,423 917,200 kWh $0.04
Electricity Demand $16,132 4,716 kW-months/year $3.42
Electricity Fees $2,902 - $ -
Natural Gas $85,471 12,687 MMBtu $6.74
TOTAL ENERGY COSTS $136,928
RECOMMENDED SAVINGS* $22,473 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,967
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$7,506
Cost:
$1,200
- - - - - - $7,506 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,506
-
$
02: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,502
Cost:
$700
- - - - - - $2,502 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,502
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,519
Cost:
$460
- - - - $2,519 374 - - -
-
kWh
-
-
kW-months/year
$2,519
374
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$727
Cost:
$105
$514 14,550 $213 62 - - - - $514
14,550
kWh
$213
62
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$8,040
Cost:
$54,300
- - - - $8,040 1,194 - - -
-
kWh
-
-
kW-months/year
$8,040
1,194
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$182
Cost:
$194
$127 3,634 $55 15 - - - - $127
3,634
kWh
$55
15
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$874
Cost:
$1,990
$616 17,387 $258 75 - - - - $616
17,387
kWh
$258
75
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$123
Cost:
$289
$123 3,465 - - - - - - $123
3,465
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$22,473
Cost:
$59,238
$1,380 39,036 $526 153 $10,559 1,568 $10,008 - $1,380
39,036
kWh
$526
153
kW-months/year
$10,559
1,568
MMBtu
$10,008
-
$
TOTAL IMPLEMENTED Savings:
$14,967
Cost:
$58,038
$1,380 39,036 $526 153 $10,559 1,568 $2,502 - $1,380
39,036
kWh
$526
153
kW-months/year
$10,559
1,568
MMBtu
$2,502
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes