Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2004 |
Principal Product | printing |
NAICS | 323111 - Commercial Printing (except Screen and Books) |
SIC | 2752 - Commercial Printing, Lithographic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 3,800,000 Pounds |
Production Hrs. Annual | 7,488 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $66,892 | 1,490,750 | kWh | $0.04 |
Electricity Demand | $15,469 | 4,404 | kW-months/year | $3.51 |
Electricity Fees | $6,921 | - | $ | - |
Natural Gas | $39,210 | 5,198 | MMBtu | $7.54 |
TOTAL ENERGY COSTS | $128,492 | |||
RECOMMENDED SAVINGS* | $29,680 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,720 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $775 Cost: $344 |
$517 | 18,120 | $258 | 29 | - | - | - | - | - | - |
$517 18,120 kWh |
$258 29 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,335 Cost: $31,871 |
$5,548 | 194,712 | $2,787 | 313 | - | - | - | - | - | - |
$5,548 194,712 kWh |
$2,787 313 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,094 Cost: $888 |
$1,094 | 38,368 | - | - | - | - | - | - | - | - |
$1,094 38,368 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $1,701 Cost: $1,500 |
$8 | 465 | $267 | 26 | $1,426 | 194 | - | - | - | - |
$8 465 kWh |
$267 26 kW-months/year |
$1,426 194 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $10,625 Cost: $538 |
- | - | - | - | - | - | - | - | $10,625 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$10,625 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST |
Savings: $7,150 Cost: $715 |
- | - | - | - | - | - | $7,150 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$7,150 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $29,680 Cost: $35,856 |
$7,167 | 251,665 | $3,312 | 368 | $1,426 | 194 | $7,150 | - | $10,625 | - | $7,167 251,665 kWh |
$3,312 368 kW-months/year |
$1,426 194 MMBtu |
$7,150 - $ |
$10,625 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,720 Cost: $3,447 |
$1,619 | 56,953 | $525 | 55 | $1,426 | 194 | $7,150 | - | - | - | $1,619 56,953 kWh |
$525 55 kW-months/year |
$1,426 194 MMBtu |
$7,150 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Primary Product |