IAC Assessment: IA0342
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0342
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2004
Principal Product printing
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 140,000
Annual Production 3,800,000 Pounds
Production Hrs. Annual 7,488
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,892 1,490,750 kWh $0.04
Electricity Demand $15,469 4,404 kW-months/year $3.51
Electricity Fees $6,921 - $ -
Natural Gas $39,210 5,198 MMBtu $7.54
TOTAL ENERGY COSTS $128,492
RECOMMENDED SAVINGS* $29,680 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,720
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$775
Cost:
$344
$517 18,120 $258 29 - - - - - - $517
18,120
kWh
$258
29
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,335
Cost:
$31,871
$5,548 194,712 $2,787 313 - - - - - - $5,548
194,712
kWh
$2,787
313
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,094
Cost:
$888
$1,094 38,368 - - - - - - - - $1,094
38,368
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$1,701
Cost:
$1,500
$8 465 $267 26 $1,426 194 - - - - $8
465
kWh
$267
26
kW-months/year
$1,426
194
MMBtu
-
-
$
-
-
$
05: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$10,625
Cost:
$538
- - - - - - - - $10,625 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$10,625
-
$
06: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$7,150
Cost:
$715
- - - - - - $7,150 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$7,150
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$29,680
Cost:
$35,856
$7,167 251,665 $3,312 368 $1,426 194 $7,150 - $10,625 - $7,167
251,665
kWh
$3,312
368
kW-months/year
$1,426
194
MMBtu
$7,150
-
$
$10,625
-
$
TOTAL IMPLEMENTED Savings:
$10,720
Cost:
$3,447
$1,619 56,953 $525 55 $1,426 194 $7,150 - - - $1,619
56,953
kWh
$525
55
kW-months/year
$1,426
194
MMBtu
$7,150
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Primary Product