Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2004 |
Principal Product | power supplies |
NAICS | 335311 - Power, Distribution, and Specialty Transformer Manufacturing |
SIC | 3612 - Transformers, Except Electronic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 210 |
Plant Area (Sq.Ft.) | 99,000 |
Annual Production | 14,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $102,371 | 3,340,200 | kWh | $0.03 |
Electricity Demand | $50,060 | 10,008 | kW-months/year | $5.00 |
Natural Gas | $36,690 | 3,736 | MMBtu | $9.82 |
TOTAL ENERGY COSTS | $191,456 | |||
RECOMMENDED SAVINGS* | $26,999 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,184 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $375 Cost: $227 |
$280 | 9,196 | $135 | 27 | - | - | $(-40) | - |
$280 9,196 kWh |
$135 27 kW-months/year |
- - MMBtu |
$(-40) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $581 Cost: $20 |
$395 | 12,896 | $186 | 37 | - | - | - | - |
$395 12,896 kWh |
$186 37 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $3,933 Cost: $5,520 |
$2,673 | 87,360 | $1,260 | 252 | - | - | - | - |
$2,673 87,360 kWh |
$1,260 252 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE |
Savings: $7,993 Cost: $6,000 |
$306 | 10,000 | $352 | 70 | $7,335 | 787 | - | - |
$306 10,000 kWh |
$352 70 kW-months/year |
$7,335 787 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $2,161 Cost: $2,400 |
$188 | 6,140 | $184 | 37 | $1,789 | 192 | - | - |
$188 6,140 kWh |
$184 37 kW-months/year |
$1,789 192 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $736 Cost: $3,053 |
$467 | 15,216 | $269 | 54 | - | - | - | - |
$467 15,216 kWh |
$269 54 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $338 Cost: $665 |
$338 | 11,081 | - | - | - | - | - | - |
$338 11,081 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $10,882 Cost: $25,488 |
$7,396 | 241,696 | $3,486 | 697 | - | - | - | - |
$7,396 241,696 kWh |
$3,486 697 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,999 Cost: $43,373 |
$12,043 | 393,585 | $5,872 | 1,174 | $9,124 | 979 | $(-40) | - | $12,043 393,585 kWh |
$5,872 1,174 kW-months/year |
$9,124 979 MMBtu |
$(-40) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,184 Cost: $12,365 |
$1,974 | 64,529 | $1,126 | 225 | $9,124 | 979 | $(-40) | - | $1,974 64,529 kWh |
$1,126 225 kW-months/year |
$9,124 979 MMBtu |
$(-40) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |