Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2004 |
Principal Product | cucumber pickles and relishes |
NAICS | 311421 - Fruit and Vegetable Canning |
SIC | 2035 - Pickles, Sauces, And Salad Dressings |
Sales | $5,000,000-$10,000,000 |
# of Employees | 130 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 19,200,000 Pounds |
Production Hrs. Annual | 2,080 |
Location (State) | MN |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $98,902 | 2,787,600 | kWh | $0.04 |
Electricity Demand | $72,477 | 8,448 | kW-months/year | $8.58 |
Natural Gas | $283,661 | 46,354 | MMBtu | $6.12 |
TOTAL ENERGY COSTS | $455,040 | |||
RECOMMENDED SAVINGS* | $47,021 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,359 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $5,113 Cost: $300 |
- | - | - | - | $5,113 | 848 | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,113 848 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $965 Cost: $25 |
- | - | - | - | $965 | 160 | - | - | - | - |
- - kWh |
- - kW-months/year |
$965 160 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER |
Savings: $12,422 Cost: $17 |
- | - | - | - | $12,422 | 2,060 | - | - | - | - |
- - kWh |
- - kW-months/year |
$12,422 2,060 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN |
Savings: $8,646 Cost: $2 |
- | - | - | - | $5,608 | 930 | - | - | $3,038 | - |
- - kWh |
- - kW-months/year |
$5,608 930 MMBtu |
- - $ |
$3,038 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $9,161 Cost: $3 |
- | - | - | - | $8,617 | 1,429 | - | - | $544 | - |
- - kWh |
- - kW-months/year |
$8,617 1,429 MMBtu |
- - $ |
$544 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $540 Cost: $359 |
- | - | - | - | $540 | 56 | - | - | - | - |
- - kWh |
- - kW-months/year |
$540 56 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $956 Cost: $230 |
$855 | 24,460 | $401 | 47 | - | - | $(-300) | - | - | - |
$855 24,460 kWh |
$401 47 kW-months/year |
- - MMBtu |
$(-300) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,227 Cost: $3 |
$1,310 | 37,440 | $917 | 108 | - | - | - | - | - | - |
$1,310 37,440 kWh |
$917 108 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,817 Cost: $1 |
$757 | 21,632 | $1,060 | 125 | - | - | - | - | - | - |
$757 21,632 kWh |
$1,060 125 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,274 Cost: $3,116 |
$1,560 | 44,525 | $714 | 84 | - | - | - | - | - | - |
$1,560 44,525 kWh |
$714 84 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,521 Cost: $2 |
$880 | 25,065 | $641 | 76 | - | - | - | - | - | - |
$880 25,065 kWh |
$641 76 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $334 Cost: $616 |
$334 | 9,530 | - | - | - | - | - | - | - | - |
$334 9,530 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7131 ADD AREA LIGHTING SWITCHES |
Savings: $1,045 Cost: $689 |
$1,045 | 29,879 | - | - | - | - | - | - | - | - |
$1,045 29,879 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,021 Cost: $5,363 |
$6,741 | 192,531 | $3,733 | 440 | $33,265 | 5,483 | $(-300) | - | $3,582 | - | $6,741 192,531 kWh |
$3,733 440 kW-months/year |
$33,265 5,483 MMBtu |
$(-300) - $ |
$3,582 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,359 Cost: $913 |
$1,735 | 49,525 | $1,042 | 123 | $32,300 | 5,323 | $(-300) | - | $3,582 | - | $1,735 49,525 kWh |
$1,042 123 kW-months/year |
$32,300 5,323 MMBtu |
$(-300) - $ |
$3,582 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost |