Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2005
Principal Product Class "C" motorhomes and commercial units
NAICS 336211 - Motor Vehicle Body Manufacturing
SIC 3716 - Motor Homes
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 93,000
Annual Production 250 Tons
Production Hrs. Annual 2,210
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,541 780,660 kWh $0.06
Electricity Fees $2,189 - $ -
Natural Gas $59,999 7,508 MMBtu $7.99
TOTAL ENERGY COSTS $105,729
RECOMMENDED SAVINGS* $64,512 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,937
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Natural Gas Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$443
Cost:
$52
$443 8,397 - - - - - - $443
8,397
kWh
-
-
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$758
Cost:
$200
$758 14,289 - - - - - - $758
14,289
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$487
Cost:
$1,080
$487 9,239 - - - - - - $487
9,239
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$9,149
Cost:
-
- - $9,149 1,235 - - - - -
-
kWh
$9,149
1,235
MMBtu
-
-
$
-
-
$
05: 4.623 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME Savings:
$20,800
Cost:
$1,046
- - - - $20,800 - - - -
-
kWh
-
-
MMBtu
$20,800
-
$
-
-
$
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$650
Cost:
$1,840
- - - - $650 - - - -
-
kWh
-
-
MMBtu
$650
-
$
-
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$650
Cost:
$1,270
- - - - $650 - - - -
-
kWh
-
-
MMBtu
$650
-
$
-
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$11,267
Cost:
$14,500
- - - - $11,267 - - - -
-
kWh
-
-
MMBtu
$11,267
-
$
-
-
$
09: 4.448 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM Savings:
$8,580
Cost:
$14,000
- - - - $8,580 - - - -
-
kWh
-
-
MMBtu
$8,580
-
$
-
-
$
10: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$2,781
Cost:
$500
- - - - $2,781 - - - -
-
kWh
-
-
MMBtu
$2,781
-
$
-
-
$
11: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$1,202
Cost:
$1,640
- - - - - - $1,202 - -
-
kWh
-
-
MMBtu
-
-
$
$1,202
-
$
12: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$7,745
Cost:
$28,000
- - - - - - $7,745 - -
-
kWh
-
-
MMBtu
-
-
$
$7,745
-
$
TOTAL RECOMMENDED Savings:
$64,512
Cost:
$64,128
$1,688 31,925 $9,149 1,235 $44,728 - $8,947 - $1,688
31,925
kWh
$9,149
1,235
MMBtu
$44,728
-
$
$8,947
-
$
TOTAL IMPLEMENTED Savings:
$32,937
Cost:
$5,488
$1,688 31,925 $9,149 1,235 $22,100 - - - $1,688
31,925
kWh
$9,149
1,235
MMBtu
$22,100
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Natural Gas Administrative Changes One-time Revenue or Avoided Cost