Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2005
Principal Product mechanic trucks, hook lifts
NAICS 333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 150,396
Annual Production 600 Pieces
Production Hrs. Annual 5,460
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $190,121 2,201,607 kWh $0.09
Electricity Fees $4,334 - $ -
Natural Gas $109,138 11,575 MMBtu $9.43
TOTAL ENERGY COSTS $303,593
RECOMMENDED SAVINGS* $32,336 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,221
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,447
Cost:
$94
$1,447 16,800 - - $1,447
16,800
kWh
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,881
Cost:
$359
$1,881 21,841 - - $1,881
21,841
kWh
-
-
MMBtu
03: 2.4234 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER Savings:
$1,412
Cost:
$143
$1,412 16,403 - - $1,412
16,403
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,473
Cost:
$1,147
- - $1,473 170 -
-
kWh
$1,473
170
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,419
Cost:
$5,844
$3,419 39,708 - - $3,419
39,708
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,460
Cost:
$12,810
$7,460 88,636 - - $7,460
88,636
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,784
Cost:
$2,706
$3,784 43,953 - - $3,784
43,953
kWh
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,668
Cost:
$1,925
$1,668 19,379 - - $1,668
19,379
kWh
-
-
MMBtu
09: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$9,792
Cost:
$6,208
- - $9,792 1,131 -
-
kWh
$9,792
1,131
MMBtu
TOTAL RECOMMENDED Savings:
$32,336
Cost:
$31,236
$21,071 246,720 $11,265 1,301 $21,071
246,720
kWh
$11,265
1,301
MMBtu
TOTAL IMPLEMENTED Savings:
$29,221
Cost:
$29,217
$17,956 210,541 $11,265 1,301 $17,956
210,541
kWh
$11,265
1,301
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas