Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Iowa State University |
---|---|
Assessment Year | 2006 |
Principal Product | processed meat |
NAICS | 311612 - Meat Processed from Carcasses |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $50,000,000-$100,000,000 |
# of Employees | 330 |
Plant Area (Sq.Ft.) | 180,000 |
Annual Production | 70,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | IA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $600,067 | 16,657,200 | kWh | $0.04 |
Electricity Demand | $455,297 | 3,059 | kW-months/year | $148.84 |
Electricity Fees | $1,457 | - | $ | - |
Natural Gas | $1,360,263 | 133,052 | MMBtu | $10.22 |
TOTAL ENERGY COSTS | $2,417,084 | |||
RECOMMENDED SAVINGS* | $77,936 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,748 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $781 Cost: $25 |
$472 | 13,104 | $309 | 25 | - | - |
$472 13,104 kWh |
$309 25 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,228 Cost: $600 |
$3,160 | 87,608 | $2,068 | 168 | - | - |
$3,160 87,608 kWh |
$2,068 168 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $302 Cost: $3,899 |
$180 | 4,992 | $122 | 10 | - | - |
$180 4,992 kWh |
$122 10 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,836 Cost: $4,661 |
$1,715 | 47,610 | $1,121 | 92 | - | - |
$1,715 47,610 kWh |
$1,121 92 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7122 DISCONNECT BALLASTS |
Savings: $810 Cost: $83 |
$490 | 13,603 | $320 | 26 | - | - |
$490 13,603 kWh |
$320 26 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2447 HEAT WATER WITH EXHAUST HEAT |
Savings: $57,298 Cost: $18,000 |
- | - | - | - | $57,298 | 5,623 |
- - kWh |
- - kW-months/year |
$57,298 5,623 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE |
Savings: $6,338 Cost: $500 |
- | - | - | - | $6,338 | 622 |
- - kWh |
- - kW-months/year |
$6,338 622 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $2,234 Cost: $1,702 |
- | - | - | - | $2,234 | 211 |
- - kWh |
- - kW-months/year |
$2,234 211 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2163 USE MINIMUM STEAM OPERATING PRESSURE |
Savings: $2,109 Cost: $25 |
- | - | - | - | $2,109 | 207 |
- - kWh |
- - kW-months/year |
$2,109 207 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $77,936 Cost: $29,495 |
$6,017 | 166,917 | $3,940 | 321 | $67,979 | 6,663 | $6,017 166,917 kWh |
$3,940 321 kW-months/year |
$67,979 6,663 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,748 Cost: $11,445 |
$5,545 | 153,813 | $3,631 | 296 | $8,572 | 833 | $5,545 153,813 kWh |
$3,631 296 kW-months/year |
$8,572 833 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |