IAC logo
IAC Assessment: IA0397
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0397
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2006
Principal Product Primal Beef Cuts
NAICS 311611 - Animal (except Poultry) Slaughtering
SIC 2011 - Meat Packing Plants
Sales >$500,000,000
# of Employees 1,800
Plant Area (Sq.Ft.) 520,000
Annual Production 1,200,000 Units
Production Hrs. Annual 5,616
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,670,511 85,806,954 kWh $0.02
Electricity Demand $1,702,184 162,588 kW-months/year $10.47
Electricity Fees $3,372,996 - $ -
Natural Gas $5,048,817 571,047 MMBtu $8.84
TOTAL ENERGY COSTS $11,794,508
RECOMMENDED SAVINGS* $192,371 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,016
Cost:
$4,118
$2,380 123,982 $2,636 253 - - $2,380
123,982
kWh
$2,636
253
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,968
Cost:
$71,321
$7,048 368,962 $5,920 568 - - $7,048
368,962
kWh
$5,920
568
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,397
Cost:
$385
$1,397 72,764 - - - - $1,397
72,764
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,603
Cost:
$1,108
$3,497 184,211 $4,106 408 - - $3,497
184,211
kWh
$4,106
408
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,632
Cost:
$60
$1,219 63,461 $1,413 136 - - $1,219
63,461
kWh
$1,413
136
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,105
Cost:
$3,000
$5,143 267,883 $5,962 572 - - $5,143
267,883
kWh
$5,962
572
kW-months/year
-
-
MMBtu
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,904
Cost:
$140
$882 45,938 $1,022 98 - - $882
45,938
kWh
$1,022
98
kW-months/year
-
-
MMBtu
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,601
Cost:
$1,302
- - - - $6,601 747 -
-
kWh
-
-
kW-months/year
$6,601
747
MMBtu
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$45,154
Cost:
$2,500
- - - - $45,154 5,108 -
-
kWh
-
-
kW-months/year
$45,154
5,108
MMBtu
10: 2.2162 REDUCE EXCESS STEAM BLEEDING Savings:
$97,991
Cost:
$10,000
- - - - $97,991 11,085 -
-
kWh
-
-
kW-months/year
$97,991
11,085
MMBtu
TOTAL RECOMMENDED Savings:
$192,371
Cost:
$93,934
$21,566 1,127,201 $21,059 2,035 $149,746 16,940 $21,566
1,127,201
kWh
$21,059
2,035
kW-months/year
$149,746
16,940
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas