IAC logo
IAC Assessment: IA0408
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0408
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2007
Principal Product Aviation Electronics
NAICS 334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812 - Search And Navigation Equipment
Sales $10,000,000-$50,000,000
# of Employees 268
Plant Area (Sq.Ft.) 46,000
Annual Production 12,000 Pieces
Production Hrs. Annual 6,000
Location (State) IA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,345 2,041,000 kWh $0.04
Electricity Demand $18,473 489 kW-months/year $37.78
Natural Gas $3,111 339 MMBtu $9.18
TOTAL ENERGY COSTS $109,929
RECOMMENDED SAVINGS* $13,356 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,366
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,366
Cost:
$16,698
$8,235 192,815 $1,131 371 $8,235
192,815
kWh
$1,131
371
kW-months/year
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,284
Cost:
$1,309
$3,284 76,902 - - $3,284
76,902
kWh
-
-
kW-months/year
03: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$215
Cost:
$25
$187 4,374 $28 9 $187
4,374
kWh
$28
9
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$491
Cost:
$700
$430 10,071 $61 20 $430
10,071
kWh
$61
20
kW-months/year
TOTAL RECOMMENDED Savings:
$13,356
Cost:
$18,732
$12,136 284,162 $1,220 400 $12,136
284,162
kWh
$1,220
400
kW-months/year
TOTAL IMPLEMENTED Savings:
$9,366
Cost:
$16,698
$8,235 192,815 $1,131 371 $8,235
192,815
kWh
$1,131
371
kW-months/year