IAC Assessment: IA0445
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: IA0445
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Iowa State University
Assessment Year 2009
Principal Product Trailers
NAICS 336212 - Truck Trailer Manufacturing
SIC 3715 - Truck Trailers
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 105,000
Annual Production 663 Pieces
Production Hrs. Annual 2,080
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $120,494 2,234,770 kWh $0.05
Electricity Demand $78,615 6,415 kW-months/year $12.25
Natural Gas $179,888 18,885 MMBtu $9.53
TOTAL ENERGY COSTS $378,997
RECOMMENDED SAVINGS* $47,903 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Gas Electricity Usage Electricity Demand Natural Gas Other Gas
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,949
Cost:
$19,383
$4,317 79,664 $5,632 460 - - - - $4,317
79,664
kWh
$5,632
460
kW-months/year
-
-
MMBtu
-
-
MMBtu
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$962
Cost:
$81
$417 7,706 $545 - - - - - $417
7,706
kWh
$545
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,603
Cost:
$4,551
$1,603 29,633 - - - - - - $1,603
29,633
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,460
Cost:
$100
- - - - $5,460 579 - - -
-
kWh
-
-
kW-months/year
$5,460
579
MMBtu
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,180
Cost:
$560
$195 3,600 $2,985 20 - - - - $195
3,600
kWh
$2,985
20
kW-months/year
-
-
MMBtu
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,637
Cost:
$506
$2,978 54,981 $3,659 288 - - - - $2,978
54,981
kWh
$3,659
288
kW-months/year
-
-
MMBtu
-
-
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,414
Cost:
$25
$635 11,713 $779 64 - - - - $635
11,713
kWh
$779
64
kW-months/year
-
-
MMBtu
-
-
MMBtu
08: 2.7314 REDUCE VENTILATION AIR Savings:
$18,248
Cost:
$20,000
- - - - $18,248 1,935 - - -
-
kWh
-
-
kW-months/year
$18,248
1,935
MMBtu
-
-
MMBtu
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$450
Cost:
$134
- - - - - - $450 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$450
-
MMBtu
TOTAL RECOMMENDED Savings:
$47,903
Cost:
$45,340
$10,145 187,297 $13,600 832 $23,708 2,514 $450 - $10,145
187,297
kWh
$13,600
832
kW-months/year
$23,708
2,514
MMBtu
$450
-
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Other Gas Electricity Usage Electricity Demand Natural Gas Other Gas